Tender Details

Particulars Details
Title
For The Work Of Repair Of Head Regulator Gate Of Bichhuwa Minor Rd. 0.00 Km. To Rd. 5.84 Km. And Tighar Minor Rd. 0.00 Km. To Rd. 5.90 Km. Of Left Bank Canal Of R.A.B.L.S. Project.
Description
For The Work Of Repair Of Head Regulator Gate Of Bichhuwa Minor Rd. 0.00 Km. To Rd. 5.84 Km. And Tighar Minor Rd. 0.00 Km. To Rd. 5.90 Km. Of Left Bank Canal Of R.A.B.L.S. Project.
Organisation Narmada Valley Development Authority | State Govt. and UT
Tender Id 2024_NVDA_391266_1
Reference
Number
189/Ts. 2024-25
Tender Fee 2295
EMD 4573
Tender Value
Place BARGI NAGAR
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=460429
Start Date December 27, 2024 23:00
End Date

20/01/2025 ( Expired 129 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Roller repair and overhauling work on gates of shahdara drain and hindon cut canal regulator new delhi.

Roller repair and overhauling work on gates of shahdara drain and hindon cut canal regulator new delhi.&amp#x0d

Read more
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)

Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp

S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Read more
Repair maintenance to gi ci and di pipe lines gate sluice valves and misc work of water pipe line system at sector a under ge utility ambala

Repair maintenance to gi ci and di pipe lines gate sluice valves and misc work of water pipe line system at sector a under ge utility ambala

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise