Tender Details

Particulars Details
Title
Construction &Amp Operation Of Gati Shakti Multi Modal Cargo Terminal (Gct) To Be Up Entirely On Railway Land
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 76635588
Reference
Number
C9RNYGCTKDKN320242
Tender Fee 0
EMD 3.53 Crore
Tender Value
Place Guwahati
Link https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76635588/viewNitPdf_4668256.pdf
Start Date August 04, 2024 03:00
End Date

11/09/2024 ( Expired 289 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development, operation and maintenance of ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.

Development, operation and maintenance of ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.

Read more
Construction of additional lanes to act as truck parking/lay bye in sohagi ghat stretch on mangawan to mp/up border section of nh-30 in the state of madhya pradesh on epc mode

Construction of additional lanes to act as truck parking/lay bye in sohagi ghat stretch on mangawan to mp/up border section of nh-30 in the state of madhya pradesh on epc mode

Read more
Construction of rob at railway crossing on roteda to sogariya road in district kota

Construction of rob at railway crossing on roteda to sogariya road in district kota

Read more
Consultancy services for construction of jharsuguda bypass including rob including land acquisition on nh-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of odisha.

Consultancy services for construction of jharsuguda bypass including rob including land acquisition on nh-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of odisha.

Read more
Construction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)

Construction of 4 new foot over bridges in&amp#x0d indore on design, built, operate and transfer&amp#x0d basis and maintenance of existing three fobs&amp#x0d for license period of 10 years (extendable to&amp#x0d five years)

Read more
Construction of 33 kv line and 33/11 kv, 2.5 mva sub-station including terminal equipments and control room for providing power supply to indian agricultural research institute under ghilamara electrical sub-division of north lakhimpur electrical c

Construction of 33 kv line and 33/11 kv, 2.5 mva sub-station including terminal &amp#x0d equipments and control room for providing power supply to indian agricultural research &amp#x0d institute under ghilamara electrical sub-division of north lakhimpur ec

Read more
Construction of g plus 2 storied linac building and proposed horizontal and vertical extension up to (g plus 9) with provision of 10 storied of linac building (g plus 2) at 1 harish mukherjee road at ipgmer - sskm hospital, kolkata - sitc of lift

Construction of g plus 2 storied linac building and proposed horizontal and vertical extension up to (g plus&amp#x0d 9) with provision of 10 storied of linac building (g plus 2) at 1 harish mukherjee road at ipgmer - sskm&amp#x0d hospital, kolkata - sitc of lift

Read more
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications

Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications

Read more
Construction of rcc drain on both sides from rajendra kalbhor house to gawande house in ward number 15

Construction of rcc drain on both sides from rajendra kalbhor house to gawande house in ward number 15&amp#x0d

Read more
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise