Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Drinking Water Supply Facilities To Pilgrims /Security Personel And Providing And Placing On Terrace (At All Floor Levels) Polyethylene Water Storage Tank
|
| Description |
Providing Drinking Water Supply Facilities To Pilgrims /Security Personel And Providing And Placing On Terrace (At All Floor Levels) Polyethylene Water Storage Tank
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2026_PHE_307660_1 |
|
Reference Number |
NIT02/PHA of 2026-27 |
| Tender Fee | 200 |
| EMD | 6326 |
| Tender Value | - |
| Place | EXECUTIVE ENGINEER PHE CIVIL DIVISION AWANTIPORA |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=997974 |
| Start Date | April 10, 2026 21:00 |
| End Date |
Expired
17/04/2026
Expired 181 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs to water storage platform and pvc pipe line at 5th floor terrace in govt. boys hostel at churchgate, mumbai.
Repairs to water storage platform and pvc pipe line at 5th floor terrace in govt. boys hostel at churchgate, mumbai.
Read moreSupply and fixing of polyethylene water storage tanks over the terrace of hostels and connecting the cpvc pumping lines in spw college areas ttd tirupati
Supply and fixing of polyethylene water storage tanks over the terrace of hostels and connecting the cpvc pumping lines in spw college areas ttd tirupati
Read moreRemoving dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Removing dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Read moreCustom bid for services - retrieval of galvanized metal boxes gmbs weighing upto 25kgs 2 5 cu ft size from 40 feet height storage racks to enable inspection of stored documents and placing back on floor & ground level racks at mahape navi mumbai 4007..
Custom bid for services - retrieval of galvanized metal boxes gmbs weighing upto 25kgs 2 5 cu ft size from 40 feet height storage racks to enable inspection of stored documents and placing back on floor & ground level racks at mahape navi mumbai 4007..
Read moreCopper alloy taps/stop valves (v2) conforming to is 8931,towel ring,copper alloy taps/stop valves (v2) conforming to is 8931,copper alloy taps/stop valves (v2) conforming to is 8931,copper alloy taps/stop valves (v2) conforming to is 8931,waste fittings for washbasin and sinks as per is 2963,rotational moulded polyethylene water storage tanks (v3) conforming to is 12701,rotational moulded polyethylene water storage tanks (v3) conforming to is 12701,metal alloy casting water tap with aerator (v2),floor drain traps (v2),weld mesh febric as per is 4948,floor drain traps (v2),floor drain traps (v2)
Copper alloy taps/stop valves (v2) conforming to is 8931,towel ring,copper alloy taps/stop valves (v2) conforming to is 8931,copper alloy taps/stop valves (v2) conforming to is 8931,copper alloy taps/stop valves (v2) conforming to is 8931,waste fittings for washbasin and sinks as per is 2963,rotational moulded polyethylene water storage tanks (v3) conforming to is 12701,rotational moulded polyethylene water storage tanks (v3) conforming to is 12701,metal alloy casting water tap with aerator (v2),floor drain traps (v2),weld mesh febric as per is 4948,floor drain traps (v2),floor drain traps (v2)
Read morePreparation or demolition works,inlet piping from terrace to rest room,outlet pipe from rest room to ground,removing and refixing of acp without scaffolding,other plumbing materials,plumbing labour,purchase of wc,fixing of wc,purchase of health faucet,fixing of health faucet,purchasing of wash basin,fixing of wash basin,purchasing of pipe,fixing of pipe,bison board fixing on rest room walls,floor rising of rest room,tile for floor,tiles for walls,door for rest room,false ceiling in rest room,electrical wiring for rest room,light for rest room,exhaust fan for rest room,fluted panel in the behind wall,relamination of wall panel,all ledges,tv unit storage,false ceiling,wiring for lights,track lights,electrical labour,roller blinds non-motorised,darker sun control film in glass windows,painting,wall panel behind marketing manager table,tv panel and ledges,wall panel in the behind wall,additional storages,electrical works shifting of socket pointing and concealing of cables and other related.,supply and installati
Preparation or demolition works,inlet piping from terrace to rest room,outlet pipe from rest room to ground,removing and refixing of acp without scaffolding,other plumbing materials,plumbing labour,purchase of wc,fixing of wc,purchase of health faucet,fixing of health faucet,purchasing of wash basin,fixing of wash basin,purchasing of pipe,fixing of pipe,bison board fixing on rest room walls,floor rising of rest room,tile for floor,tiles for walls,door for rest room,false ceiling in rest room,electrical wiring for rest room,light for rest room,exhaust fan for rest room,fluted panel in the behind wall,relamination of wall panel,all ledges,tv unit storage,false ceiling,wiring for lights,track lights,electrical labour,roller blinds non-motorised,darker sun control film in glass windows,painting,wall panel behind marketing manager table,tv panel and ledges,wall panel in the behind wall,additional storages,electrical works shifting of socket pointing and concealing of cables and other related.,supply and installati
Read moreSupply and placing on terrace at all floor levels polyethylene water storage tank as per specificat
Read more
Providing and placing on terrace polyethylene water storage tank at corporate office building, mcl hq.
Providing and placing on terrace polyethylene water storage tank at corporate office building, mcl hq.
Read moreProviding and placing on terrace water storage at bhallar township of wani north area
Providing and placing on terrace water storage at bhallar township of wani north area
Read moreof your Industry type