| Particulars | Details |
|---|---|
| Title |
Construction Of Random Rubble Stone Masonry Revetment Wall At Tower No. 30 A Of 132 Kv Eldeco Pgcil Line Under Oand M Division, Ptcul, Sitarganj
|
| Description |
Construction Of Random Rubble Stone Masonry Revetment Wall At Tower No. 30 A Of 132 Kv Eldeco Pgcil Line Under Oand M Division, Ptcul, Sitarganj
|
| Organisation | MD (Power Transmisison Corporation of Uttarakhand Limited) | State Govt. and UT |
| Tender Id | 2025_PTC21_89877_1 |
|
Reference Number |
CE/OandM/PTCUL/HLD/49/2025-26 |
| Tender Fee | 5900 |
| EMD | 1.76 Lakh |
| Tender Value | - |
| Place | 132KV ELDECO-PGCIL line |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=106534 |
| Start Date | December 13, 2025 20:30 |
| End Date |
Expired
12/01/2026
Expired 278 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and erection work on 132kv busbars strengthening at 132kv s/s, eldeco, sitarganj under oandm division, ptcul, sitarganj
Supply and erection work on 132kv busbars strengthening at 132kv s/s, eldeco, sitarganj under oandm division, ptcul, sitarganj
Read moreTurfing and gravelling at nearby area of 2x40mva transformers of 132kv s/s, eldeco, sitarganj under oandm division, ptcul, sitarganj
Turfing and gravelling at nearby area of 2x40mva transformers of 132kv s/s, eldeco, sitarganj under oandm division, ptcul, sitarganj
Read moreSupply of various clamp connector, silicagel, contractor and sf-6 gas at 132kv s/s, sitarganj and 132kv s/s, eldeco, sitarganj under oandm division, ptcul, sitarganj
Supply of various clamp connector, silicagel, contractor and sf-6 gas at 132kv s/s, sitarganj and 132kv s/s, eldeco, sitarganj under oandm division, ptcul, sitarganj
Read moreConstruction of approach road and drainage parallel to boundary wall of pgcil sitarganj in 132kv switchyard of 132kv s/s, sitarganj under oandm division, ptcul, sitarganj
Construction of approach road and drainage parallel to boundary wall of pgcil sitarganj in 132kv switchyard of 132kv s/s, sitarganj under oandm division, ptcul, sitarganj
Read moreTower strengthening from tower no. 22 to tower no. 13 section of 132kv d/c khatima to pilibhit under oandm division, ptcul, sitarganj
Tower strengthening from tower no. 22 to tower no. 13 section of 132kv d/c khatima to pilibhit under oandm division, ptcul, sitarganj
Read moreRandom rubble masonry, construction of culvert, and plantation and maintenance works at photoksar departmental area of khaltse forest range for the year 2026-27 under campa scheme 52b.
Random rubble masonry, construction of culvert, and plantation and maintenance works at photoksar departmental area of khaltse forest range for the year 2026-27 under campa scheme 52b.
Read moreChanging of suspension insulator, repairing of conductor and applying bird diverter from tower no.01 at khatima-i (lohiahead) to tower no.22 near lilo point (sitarganj to lilo) of 132kv khatima to pilibhit line under oandm division, ptcul, sitarganj
Changing of suspension insulator, repairing of conductor and applying bird diverter from tower no.01 at khatima-i (lohiahead) to tower no.22 near lilo point (sitarganj to lilo) of 132kv khatima to pilibhit line under oandm division, ptcul, sitarganj
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read morePuncture insulation detection (pid) test of 132kv eldeco-pgcil sitarganj line under oandm division, ptcul, sitarganj
Puncture insulation detection (pid) test of 132kv eldeco-pgcil sitarganj line under oandm division, ptcul, sitarganj