Tender Details
Particulars | Details |
---|---|
Title |
Provision Of Rain Water Harvesting System In Maharaja Yadvindra Enclave Scheme
|
Description |
Provision Of Rain Water Harvesting System In Maharaja Yadvindra Enclave Scheme
|
Organisation | Department of Local Government | State Govt. and UT |
Tender Id | 2025_DLG_140366_1 |
Reference Number |
DNIT No. 3 of 2025 - 14 |
Tender Fee | 5201 |
EMD | 71200 |
Tender Value | |
Place | Improvement Trust Patiala |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=284346 |
Start Date | May 15, 2025 18:30 |
End Date |
27/05/2025 ( Expired 13 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreImplementation of unified asset performance management (apm) system in powergrid
Implementation of unified asset performnace management (apm) system in powergrid
Read moreProvision of solar water heating system at otm accommodation under ge (central) khadki
Provision of solar water heating system at otm accommodation under ge (central) khadki
Read moreRain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Read moreConsulting firm for preparation of detailed project report for head works for water supply improvement in new ramnagar town of madhya pradesh
Consulting firm for preparation of detailed project report for head works for water supply improvement in new ramnagar town of madhya pradesh
Read moreImprovements of existing water supply scheme in maraimalai nagar municipality
Improvements of existing water supply scheme in maraimalai nagar municipality
Read moreConstruction of rain water harvesting system at different places in ward no. 01 to 45
Construction of rain water harvesting system at different places in ward no. 01 to 45
Read moreof your Industry type