Tender Details
Particulars | Details |
---|---|
Title |
(A). Repairing Of 3.3 Kv, 630 A, Vcb, Ctr 600/300/5 A, Make Pce, Sl.No. 05/Hmv/132 Installed At Main Sub Station Of Gvp Phase Ii Ocp, (B). Repairing Of 3.3 Kv Vcb, Make Pce, 630 A, Sl.No. 05/Hmv/131 Of Secondary Switch At 3 Mva, 11 Kv/3.3 Kv Transformer Of G
|
Description |
(A). Repairing Of 3.3 Kv, 630 A, Vcb, Ctr 600/300/5 A, Make Pce, Sl.No. 05/Hmv/132 Installed At Main Sub Station Of Gvp Phase Ii Ocp, (B). Repairing Of 3.3 Kv Vcb, Make Pce, 630 A, Sl.No. 05/Hmv/131 Of Secondary Switch At 3 Mva, 11 Kv/3.3 Kv Transformer Of G
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_334188_1 |
Reference Number |
PE(E and M)/GVP Ph-II/E-Tender/2025-26/04, Dt-16.04.2025 |
Tender Fee | 0 |
EMD | 6300 |
Tender Value | |
Place | Office of the Project Engineer (E and M), GVP Ph-I |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346427 |
Start Date | April 18, 2025 15:30 |
End Date |
30/04/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
(1) repairing of (a). 325kw, 3.3kv dol er si. no. sa-1619 of gvp phase-ii ocp (b). 240kw, 3.3kv dol er si. no. sa-1617 of rkb pump of gvp phase-ii ocp (c). 200 kw, 3.3kv dol er make prabhu si. no. ht582 of gvp phase-ii ocp (d). 180kw,
(1) repairing of (a). 325kw, 3.3kv dol er si. no. sa-1619 of gvp phase-ii ocp (b). 240kw, 3.3kv dol er si. no. sa-1617 of rkb pump of gvp phase-ii ocp (c). 200 kw, 3.3kv dol er make prabhu si. no. ht582 of gvp phase-ii ocp (d). 180kw,
Read moreComplete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area
Complete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area
Read moreRepairing/reconditioning of 11kv vcb make meditron, s.no.9472 and 11kv vcb of make meditron s.no.9474 installed at main substation of karma ocp under kuju area.
Repairing/reconditioning of 11kv vcb make meditron, s.no.9472 and 11kv vcb of make meditron s.no.9474 installed at main substation of karma ocp under kuju area.
Read moreRepairing and re-winding of 325kw, 3.3kv, make-marathan, h.t motor, sl.no.-3f330720/2 of gvp ph-ii ocp
Repairing and re-winding of 325kw, 3.3kv, make-marathan, h.t motor, sl.no.-3f330720/2 of gvp ph-ii ocp
Read more(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g
(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g
Read moreRepairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Repairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Read more(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
Read moreRepairing and reconditioning of 11kv vcb make electroteknica s.no. 1735 installed with secondary control of on load isolator and 11kv vcb of make meditron s.no. 9480 installed with primary control of bus bar at main substation of karma ocp .
Repairing and reconditioning of 11kv vcb make electroteknica s.no. 1735 installed with secondary control of on load isolator and 11kv vcb of make meditron s.no. 9480 installed with primary control of bus bar at main substation of karma ocp.
Read moreRepairing rewinding and repairing of one no. 1.25mva 33kv/3.3kv power transformer make andrew yule sl no 12024 installed at rajhara ocp under rajhara area along with providing certificate from nabl regarding high pressure test with dga test of oil
Repairing rewinding and repairing of one no. 1.25mva 33kv/3.3kv power transformer make andrew yule sl no 12024 installed at rajhara ocp under rajhara area along with providing certificate from nabl regarding high pressure test with dga test of oil
Read moreRepairing and reconditioning of 1 no. 11kv meditron make vcb and 01 no. 3.3kv mineline make vcb installed at main substation and mines of topa ocp under kuju area.
Repairing and reconditioning of 1 no. 11kv meditron make vcb and 01 no. 3.3kv mineline make vcb installed at main substation and mines of topa ocp under kuju area.
Read moreof your Industry type