Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Allocation And Construction Of New Alignment Of Electrical Utility For Widening And Improvement Of Two Lane With Paved Shoulder Of Namely Kamalpur To Ambassa Road Under Ed Kamalpur
|
| Description |
Re Allocation And Construction Of New Alignment Of Electrical Utility For Widening And Improvement Of Two Lane With Paved Shoulder Of Namely Kamalpur To Ambassa Road Under Ed Kamalpur
|
| Organisation | Chairman cum MD, TSECL | State Govt. and UT |
| Tender Id | 2024_POWER_49208_1 |
|
Reference Number |
DGM/KMP/24-25/01 Dated 11/06/2024 |
| Tender Fee | 4000 |
| EMD | 2.85 Lakh |
| Tender Value | - |
| Place | ED Kamalpur |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=50066 |
| Start Date | June 13, 2024 17:30 |
| End Date |
Expired
29/06/2024
Expired 838 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreConsultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane from km.264.00 to km.400.70 anchatageri to baleguli cross of nh 52 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane from km.264.00 to km.400.70 anchatageri to baleguli cross of nh 52 in the state of karnataka
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a.
Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a in the state of uttarakhand. (length 136 km).
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type