Tender Details

Particulars Details
Title
Conductivity Meter,Bench Top Turbidity Meter
Description
Organisation NA | Ministry of Power
Tender Id GEM/2024/B/4608110
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date February 09, 2024 23:10
End Date
Expired 19/02/2024

Expired 965 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

KBS Technologies

Contract Value

55600

Tender Status: active
Buyer Name: Ungati Srinivasa Rao
Ministry: Ministry Of Power
Department: Na
Organisation: Ntpc Limited

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 KBS Technologies Make : LabIndia Model : Labindia Pico Conductivity Meter Title : Labindia Pico Conductivity Meter 17-02-2024 16:40:50 N/A Evaluated
2 SAGAR SCIENTIFIC INSTRUMENTS Make : Model : Title : 19-02-2024 14:36:30 N/A Evaluated
3 SUNTRONICS INDIA Make : Suntronics india Model : ST221 Title : Conductivity meter 14-02-2024 14:55:52 MSE Evaluated

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
035-GI Microcontroller Based Turbidity Meter, GLOBE 035-GI Microcontroller Based Turbidity Meter 2 ₹ 55600.000
Similar Tenders
Dual channel analyzer and spares for ph/conductivity measurement of swas system

Dual channel analyzer and spares for ph/conductivity measurement of swas system

Read more
Supply of multifunction meter

Supply of multifunction meter

Read more
33kv ht tvr net meter -/1a dlms cat-c 0.2s class

33kv ht tvr net meter -/1a dlms cat-c 0.2s class

Read more
Roof top rain water harvesting work for type-3 houses in chitrakoot district

Roof top rain water harvesting work for type-3 houses in chitrakoot district

Read more
Cconstruction of 20 nos. 125mm x 40mm dia x 61 meter deep and 10 nos. 125mm x 48 meter deep / hand operated t/well with india mark ii hand pump with plateform,drain and soakpit in place of old defuct/ordinary hand pumps in the water scarce area under p.h.division, biharsharif for the year 2026-27.

Cconstruction of 20 nos. 125mm x 40mm dia x 61 meter deep and 10 nos. 125mm x 48 meter deep / hand operated t/well with india mark ii hand pump with plateform,drain and soakpit in place of old defuct/ordinary hand pumps in the water scarce area under p.h.division, biharsharif for the year 2026-27.

Read more
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise