Tender Details

Particulars Details
Title
Ddc 3 Detailed Design Consultancy Services For All Structures Elevated Viaduct, Double Decker, Single Decker/Double Decker Stations, Depots Etc. For Corridor 2 Of Bangalore Metro Rail Project, Phase 3.
Description
Detailed Design Consultancy Services For All Structures Including Elevated Viaduct,Double Decker,Single Decker/Double Decker Stations,Entry/Exit Structures,Loops And Ramps For Road Flyovers,Depots,Multi Modal Integration Structure Etc. For Corridor 2
Organisation Bangalore Metro Rail Corporation Limited | Public Sector Undertakings
Tender Id 2024_BMRCL_212637_1
Reference
Number
BMRCL/Ph3/DDC3/RFP/2024/117
Tender Fee 2360
EMD 12.22 Lakh
Tender Value
Place Bangalore
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=233967
Start Date December 05, 2024 15:30
End Date

21/12/2024 ( Expired 137 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations

Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations

Read more
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale

Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale

Read more
Architectural finishing and phe works for 6 elevated stations of pkg-2 and pkg-3, phase-2b

Architectural finishing and &#x0d public health engineering works for 6 elevated stations viz, hebbal, kodigehalli, jakkur cross, yelahanka, &#x0d bagalur cross of package-2 and doddajala of package-3, in phase 2b line of bangalore metro rail project.

Read more
Maintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).

Maintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).

Read more
Other non consultancy services aerial lidar survey and other field works for final location survey fls involving for the preparation of dpr for the high speed elevated rail corridor between hyderabad-bengaluru 626 km

Other non consultancy services aerial lidar survey and other field works for final location survey fls involving for the preparation of dpr for the high speed elevated rail corridor between hyderabad-bengaluru 626 km

Read more
Other non consultancy services aerial lidar survey and other field works for final location survey fls involving for the preparation of dpr for the high speed elevated rail corridor between hyderabad chennai 705km

Other non consultancy services aerial lidar survey and other field works for final location survey fls involving for the preparation of dpr for the high speed elevated rail corridor between hyderabad chennai 705km&#x0d &#x0d

Read more
Consultancy services for preparation of detailed project report for construction of 4/6 laned high speed corridor/expressway

Consultancy services for preparation of detailed project report for construction of 4/6 laned high speed corridor/expressway of bhavnagar bharuch in the state of gujarat

Read more
Supply, installation, testing, commissioning and training of electrical, plumbing, fire protection and vac works for 9 underground stations and 10 elevated stations

R.k salai station to sholinganallur station including bored tunnel and viaduct between the stations, cut and cover tunnel, u section and elevated ramp (ch. 17250.000 to ch. 35437.030) for corridor-3 of chennai metro rail project phase ii.&#x0d

Read more
Detailed design consultancy services for 14 (fourteen) elevated stations excluding viaduct in station portion on kharadi-khadakwasla and nal stop - manik baug corridors of pune metro rail project

Detailed design consultancy services for 14 (fourteen) elevated stations excluding viaduct in station portion on kharadi-khadakwasla and nal stop - manik baug corridors of pune metro rail project

Read more
Construction of entry exit structure civil works for additional escalators supply installation of fixed glass panel at platform level for corridor 04 elevated stations of phase 2

Construction of entry exit structures closure civil works for additional escalators supply installation of fixed glass panel at platform level for corridor 04 elevated stations of chennai metro rail project phase 2

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise