Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtc Of Road Surface A.B Road To Kachhapcherra And Mtc Of Road At Bagafa Muslim Para
|
| Description |
Sh Earthwork, Brick Soling, Cd Works, Pucca Drain, C.C. Works Protection Works Etc.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_47461_1 |
|
Reference Number |
71/EE/PWD R and B/STB/2023-24 |
| Tender Fee | 1000 |
| EMD | 48388 |
| Tender Value | - |
| Place | Santirbazar, South Tripura |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=48244 |
| Start Date | February 21, 2024 23:25 |
| End Date |
Expired
11/03/2024
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Detailed and abstract estimate for borewell for muslim graveyard at ranga reddy-281, chintal circle-54,qbz,cmc (item no.7) (completion period 1 month)
Detailed and abstract estimate for borewell for muslim graveyard at ranga reddy-281, chintal circle-54,qbz,cmc (item no.7) (completion period 1 month)
Read moreDrilling of bore well at lenin nagar muslim graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.6) (completion period 1 month)
Drilling of bore well at lenin nagar muslim graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.6) (completion period 1 month)
Read moreDetailed and abstract estimate for borewell for muslim graveyard graveyard at nehru nagar under ranga reddy-281, chintal circle-54,qbz,cmc (item no.9) (completion period 1 month)
Detailed and abstract estimate for borewell for muslim graveyard graveyard at nehru nagar under ranga reddy-281, chintal circle-54,qbz,cmc (item no.9) (completion period 1 month)
Read moreKtps-vii stage - civil - o and m-i - sd-i - rectification of damaged guniting on track hopper surface of segment 2 in coal handling plant (chp) area of ktps-vii stage, paloncha, bhadradri kothagudem dist.
Ktps-vii stage - civil - o and m-i - sd-i - rectification of damaged guniting on track hopper surface of segment 2 in coal handling plant (chp) area of ktps-vii stage, paloncha, bhadradri kothagudem dist.
Read moreUrgent mtc. of road from bagafa muslim para to akangma para via govind bari, kala lowgang, durpa bari, under santirbazar
Sh- brick walls, wbm-iii, carpeting and re-carpeting, drain etc. during the year 2024-25(2nd call).
Read moreMtc of road surface from bagafa to gobinbari
Repairs of potholes, wbm-iii, carpeting, re-carpeting, seal coat, sand seal coat, unlined surface drain etc.
Read moreConstruction of surface drain at ghosh para muslim para in dawaguri village
Construction of surface drain at ghosh para muslim para in dawaguri village
Read moreMtc. of road from murasingh para road to garo colony via muslim para
Repairs to road by potholes repair, re-carpeting, road side drain etc. during the year 2023-24.
Read moreFdr/ urgent mtc. of different road for bagafa and devipur area surface under santirbazar sub-division
Sh - removal of soil, construction of embankment, missing soling, repairs of potholes, unlined surface drains, palasiding works etc. during the year 2024-25
Read moreof your Industry type