Tender Details

Particulars Details
Title
Mtps I Bm Unit Iii Boiler Pressure Parts Aoh 2025 Reconditioning And Hard Facing Of Used And Worn Out Square Coal Nozzle Tips And Checking Of Deformation And Matching With Nozzle
Description
Mtps I Bm Unit Iii Boiler Pressure Parts Aoh 2025 Reconditioning And Hard Facing Of Used And Worn Out Square Coal Nozzle Tips And Checking Of Deformation And Matching With Nozzle
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_531147_1
Reference
Number
CE / MTPS-I / SE / M-I / BM /OT.313 / 2024-25
Tender Fee 0
EMD 7100
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=632263

Start Date March 10, 2025 14:30
End Date
Expired 24/03/2025

Expired 571 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul

Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul

Read more
Supply of ss plate gr-309s for reconditioning the coal nozzle tips

Supply of ss plate gr-309s for reconditioning the coal nozzle tips

Read more
Supply of ss plate gr 309s for reconditioning the coal nozzle tips

Supply of ss plate gr 309s for reconditioning the coal nozzle tips

Read more
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f

Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f

Read more
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work

Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work

Read more
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Read more
Mtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27

Mtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27

Read more
Ttps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi

Ttps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi

Read more
Mtps i bm unit iii boiler pressure parts aoh 2024 reconditioning and hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle

Mtps i bm unit iii boiler pressure parts aoh 2024 reconditioning and hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle

Mtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise