Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Unit Iii Boiler Pressure Parts Aoh 2025 Reconditioning And Hard Facing Of Used And Worn Out Square Coal Nozzle Tips And Checking Of Deformation And Matching With Nozzle
|
| Description |
Mtps I Bm Unit Iii Boiler Pressure Parts Aoh 2025 Reconditioning And Hard Facing Of Used And Worn Out Square Coal Nozzle Tips And Checking Of Deformation And Matching With Nozzle
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_531147_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.313 / 2024-25 |
| Tender Fee | 0 |
| EMD | 7100 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=632263 |
| Start Date | March 10, 2025 14:30 |
| End Date |
Expired
24/03/2025
Expired 571 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Read moreSupply of ss plate gr-309s for reconditioning the coal nozzle tips
Supply of ss plate gr-309s for reconditioning the coal nozzle tips
Read moreSupply of ss plate gr 309s for reconditioning the coal nozzle tips
Supply of ss plate gr 309s for reconditioning the coal nozzle tips
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27
Mtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27
Read moreTtps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi
Ttps mech ii bm unit v inspection of rotary and traverse gear boxes reconditioning of the head assembly and swivel tube assembly cleaning the nozzle checking rotary and traverse movement of the swivel tube assembly of water wall blowers in unit v boi
Read moreMtps i bm unit iii boiler pressure parts aoh 2024 reconditioning and hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle
Mtps i bm unit iii boiler pressure parts aoh 2024 reconditioning and hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Mtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Read moreof your Industry type