Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Toe Wall At Side Slope Of Ob Heap Near Intermediate Sump Under Rocp.
|
| Description |
Construction Of Rcc Toe Wall At Side Slope Of Ob Heap Near Intermediate Sump Under Rocp.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_329645_1 |
|
Reference Number |
ECL/RJML/AGM/AE(C)/ e-Ten/24-25/562 Dt-19.02.2025 |
| Tender Fee | 0 |
| EMD | 23700 |
| Tender Value | - |
| Place | Rajmahal OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341684 |
| Start Date | February 21, 2025 00:25 |
| End Date |
Expired
03/03/2025
Expired 553 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna
Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna
Read moreRepairing of guard wall at toe of ob dump near intermediate sump to towards upper ramp portion of charan tola ob dump under rocp.
Repairing of guard wall at toe of ob dump near intermediate sump to towards upper ramp portion of charan tola ob dump under rocp.
Read moreConstruction of rcc toe wall at the toe of ob dump near lalghutua under rocp.
Construction of rcc toe wall at the toe of ob dump near lalghutua under rocp.
Read moreConstruction of retaining wall at lower embankment of ob dump near intermediate sump under rocp.
Construction of retaining wall at lower embankment of ob dump near intermediate sump under rocp.
Read moreExtension of rcc wall along ob embankment way towards unloading haul road or towards intermediate sump for protection of toe from erosion under rocp.
Extension of rcc wall along ob embankment way towards unloading haul road or towards intermediate sump for protection of toe from erosion under rocp.
Read moreStrengthening of rcc drain in front of old intermediate sump under rocp.
Strengthening of rcc drain in front of old intermediate sump under rocp.
Read moreConstruction of toe wall along road embankment lower side from existing toe wall towards near uta sump for protection of toe from erosion under rocp.
Construction of toe wall along road embankment lower side from existing toe wall towards near uta sump for protection of toe from erosion under rocp.
Read moreConstruction of rcc drain at the toe of ob dump along light vehicle road under rocp.
Construction of rcc drain at the toe of ob dump along light vehicle road under rocp.
Read moreExtension of rcc toe wall along light vehicle road near dozer section under rocp.
Extension of rcc toe wall along light vehicle road near dozer section under rocp.
Read moreDry stone pitching at side slope of ob dump to protect erosion of soil at dmz view point under rocp.
Dry stone pitching at side slope of ob dump to protect erosion of soil at dmz view point under rocp.
Read moreof your Industry type