Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Retaining Wall And Pcc Retaining Wall Footpath Side Drain And Hand Railing Between Rajendran House To P Krishna House At Dudh Line In Ward No 12
|
| Description |
Construction Of Rcc Retaining Wall And Pcc Retaining Wall Footpath Side Drain And Hand Railing Between Rajendran House To P Krishna House At Dudh Line In Ward No 12
|
| Organisation | Government of Andaman and Nicobar Islands (U.T) |
| Tender Id | 2023_PMBC_10844_1 |
|
Reference Number |
19/EE-II/Wks/MC/2023-24 |
| Tender Fee | 0 |
| EMD | 24252 |
| Tender Value | - |
| Place | EE-II(Works) PBMC |
| Link |
View Original Tender Notice
https://eprocure.andaman.gov.in |
| Start Date | July 07, 2023 18:15 |
| End Date |
Expired
14/07/2023
Expired 1189 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Renovation of pcc footpath from shri. late. krishna house to shri. dori lall house at mohanpura ward no.04.
Renovation of pcc footpath from shri. late. krishna house to shri. dori lall house at mohanpura ward no.04.
Read moreRepair and maintenance and providing hand railing footpath with covering slab and wall at various place at haddo (ward no.02)
Repair and maintenance and providing hand railing footpath with covering slab and wall at various place at haddo (ward no.02)
Read moreRenovation of footpath, drain and construction of hand railing from late. peer bux house to shri. venkatrathnam house at round basthi, ward no.04.
Renovation of footpath, drain and construction of hand railing from late. peer bux house to shri. venkatrathnam house at round basthi, ward no.04.
Read moreImprovement of services (road, drain, footpath, rcc duct work between sector-2 and 3 along zonal road no.-3 from harola chowk), noida
Improvement of services (road, drain, footpath, rcc duct work between sector-2 and 3 along zonal road no.-3 from harola chowk), noida
Read moreRenovation of motorable and footpath steps side drain flooring and construction of side drain wall and hand railing starting from peon qtr ending to malaikandaiah dhara devi and rajan house at peon qtrs area in ward no 10
Renovation of motorable and footpath steps side drain flooring and construction of side drain wall and hand railing starting from peon qtr ending to malaikandaiah dhara devi and rajan house at peon qtrs area in ward no 10
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreConstruction of staff quarters at (gajrahi, bahari, deosar and gondawali station and overhead & under ground water tank with water supply & distribution pipe line, including plumbing, bore well, hand pump, drainage, sewerage & sanitary work with septic tank, boundary wall, road work and other miscellaneous work in between sidhi-gondawali section and miscellaneous protection works for major/minor bridges, high embankment slope protection, rcc toe wall/gabion wall at locations whe
Construction of staff quarters at (gajrahi, bahari, deosar and gondawali station and overhead & under ground water tank with water supply & distribution pipe line, including plumbing, bore well, hand pump, drainage, sewerage & sanitary work with septic tank, boundary wall, road work and other miscellaneous work in between sidhi-gondawali section and miscellaneous protection works for major/minor bridges, high embankment slope protection, rcc toe wall/gabion wall at locations whe
Read moreDismantl pcc,dismantl brick mason,dismantl rcc,excv less than 3 ord dis out,wet mix macadam,s and f coarse sand,pcc plin 1 is to 1.5 is to 3 cs,brk msn pl cs cl50,plaster 18mm cs 1 is to 5,neat cement punning,rcc design mix m25,sfe str stl manual,steel reinforcement,precast rcc,hume pipe np3 600mm,bld pnt cmt prim 2c,bld pnt exterior,bld pop putty,bib cock,urinal china 430x260,soap tray,towel ring,pvc exhaust fan 12 inch,ceiling fan 48 inch,soak pit,hdpe water tk 1000l,pcc plin 1 is to 3 is to 6 cs,hf brk ab pl cs c75,stone raise pointing,plaster 12mm cs 1 is to 5,plaster 6mm cs 1 is to 4,ceramic tiles 5mm,vitrified 600x600x10,upvc waste pip 100nb,hdpe pipe conceal 20,hdpe pipe conceal 25,hdpe water tk 500l,brass ball vlv 25nb,mirror 6mm polished,towel rail,wash basin 450x300mm,soap container,wc indian,urinal china 580x380,floor trap 100mm opn,stop cock 20nb,wood door nondeco 35,louver glass powder,septic tank 100 pers,ss 304 grade railing
Dismantl pcc,dismantl brick mason,dismantl rcc,excv less than 3 ord dis out,wet mix macadam,s and f coarse sand,pcc plin 1 is to 1.5 is to 3 cs,brk msn pl cs cl50,plaster 18mm cs 1 is to 5,neat cement punning,rcc design mix m25,sfe str stl manual,steel reinforcement,precast rcc,hume pipe np3 600mm,bld pnt cmt prim 2c,bld pnt exterior,bld pop putty,bib cock,urinal china 430x260,soap tray,towel ring,pvc exhaust fan 12 inch,ceiling fan 48 inch,soak pit,hdpe water tk 1000l,pcc plin 1 is to 3 is to 6 cs,hf brk ab pl cs c75,stone raise pointing,plaster 12mm cs 1 is to 5,plaster 6mm cs 1 is to 4,ceramic tiles 5mm,vitrified 600x600x10,upvc waste pip 100nb,hdpe pipe conceal 20,hdpe pipe conceal 25,hdpe water tk 500l,brass ball vlv 25nb,mirror 6mm polished,towel rail,wash basin 450x300mm,soap container,wc indian,urinal china 580x380,floor trap 100mm opn,stop cock 20nb,wood door nondeco 35,louver glass powder,septic tank 100 pers,ss 304 grade railing
Read moreConstruction of pcc retaining wall muslim basti footpath side near saira banu house to alimia house footpath step renovation with hand railing at ward no 08
Construction of pcc retaining wall muslim basti footpath side near saira banu&#x0d house to alimia house footpath step renovation with hand railing&#x0d at ward no 08
Read moreof your Industry type