Tender Details
Particulars | Details |
---|---|
Title |
Supply, Delivery And Fixing Of Bearing For 100 Hp Pump At Old Raw Water Pump House At Basapuram In Adoni Under General Funds 2023 24
|
Description |
Supply, Delivery And Fixing Of Bearing For 100 Hp Pump At Old Raw Water Pump House At Basapuram In Adoni Under General Funds 2023 24
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 723594 |
Reference Number |
T.No.39-36/ADN/Mplty/Genl Funds/2023-24 Dt. 09-03-2024 |
Tender Fee | 27 |
EMD | 740 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | March 09, 2024 21:30 |
End Date |
12/03/2024 ( Expired 425 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreSupply and installation of ict equipments for online courts,
Supply and installation of ict equipments for online courts, &#x0d live streaming and paperless court in court complexes under e&#x0d courts project phase iii
Read moreRepair/ maintenance of pumping system, pipelines, control valves lt switchgear and allied works at jne, map accn, stps area, r centre, alpha mess pumphouse and other water supply installations under ge (u) udhampur
Repair/ maintenance of pumping system, pipelines, control valves lt switchgear and allied works at jne, map accn, stps area, r centre, alpha mess pumphouse and other water supply installations under ge (u) udhampur
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreSurvey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Survey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Read moreSupply and fixing of long arm, earth spike and cap for street light poles at ktps township
Supply and fixing of long arm, earth spike and cap for street light poles at ktps township
Read moreof your Industry type