Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Procurement Opportunity: Di Pipe For Dry Ash System 🏭 The West Bengal Power Development Corporation Ltd., On Behalf Of The State Government And Union Territories, Is Seeking Bids For The Procurement Of Di Pipes For The Dry Ash System Under The Ahp M/M Project At Kolaghat Thermal Power Station. 📅 Bid Submission Deadline: July 10, 2024, 2:30 Pm A Tender Fee Of Inr 27,200 Is Applicable, With No Emd Required. Interested Bidders Should Provide Detailed Technical And Financial Bids, Demonstrating Their Capability To Supply High Quality Di Pipes That Meet The Specifications And Standards Required For The Dry Ash System. Keywords: Procurement, Di Pipe, Dry Ash System, Ahp M/M, Kolaghat Thermal Power Station, West Bengal Power Development Corporation Limited, State Govt. And Ut, Tender, Bid| Particulars | Details |
|---|---|
| Title |
Procurement Of Di Pipe For Dry Ash System Under Ahp M/M, Ktps.
|
| Description |
Procurement Of Di Pipe For Dry Ash System Under Ahp M/M, Ktps.
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_691494_1 |
|
Reference Number |
WBPDCL/KTPS/NIT/E2982/24-25 |
| Tender Fee | 0 |
| EMD | 27200 |
| Tender Value | - |
| Place | Kolaghat Thermal Power Station |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1505840 |
| Start Date | June 27, 2024 15:30 |
| End Date |
Expired
10/07/2024
Expired 823 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares for silo vent fan in dry ash handling plant ktps- v stage
Spares for silo vent fan in dry ash handling plant ktps- v stage
Read moreCeramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Read moreFly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Read moreSpares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Spares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Read moreKtps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Read moreSpares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreVacuum transmitters and pressure transmitters for ahp
Vacuum transmitters and pressure transmitters for ahp
Read moreof your Industry type