Tender Details

Particulars Details
Title
Supply Of Site Supervisors (Semi Skilled) Preferably Iti Or Experienced For Supervision Of Worksites Of Salandi Left Main Canal (Slmc) From Rd 30.547 Km To 45.570 Km And From Rd 49.810 Km To 59.970 Km Under Markona Canal Division, Markona For The Per
Description
Supply Of Site Supervisors (Semi Skilled) Preferably Iti Or Experienced For Supervision Of Worksites Of Salandi Left Main Canal (Slmc) From Rd 30.547 Km To 45.570 Km And From Rd 49.810 Km To 59.970 Km Under Markona Canal Division, Markona For The Per
Organisation CCE,Anandapur Barrage Project | State Govt. and UT
Tender Id 2025_CCEAB_113102_1
Reference
Number
MCD-04 of 2025-26
Tender Fee 4000
EMD 7500
Tender Value
Place O/O THE SE, MCD, MARKONA
Link https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=538387
Start Date May 05, 2025 16:00
End Date

14/05/2025 ( Expired 35 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Appointment of third-party inspection agency (tpia) for construction of distribution system for 7171.77 ha. of cca including command area development (cad) of salandi left main canal from rd 40.927 km to 45.570 km through under ground pipe line irrig

Appointment of third-party inspection agency&amp#x0d (tpia) for&amp#x0d construction of distribution system for 7171.77 ha. of cca including command area development (cad) of salandi left main canal from rd 40.927 km to 45.570 km through ugpl

Read more
E-tender for disposal of 4062.30 cubic meter baloo or morrum collected from chainage 0.00 km to 03.00 km at the bottom of son pump canal located at patwadh under tehsil obra of sonbhadra district

E-tender for disposal of 4062.30 cubic meter baloo or morrum collected from chainage 0.00 km to 03.00 km at the bottom of son pump canal located at patwadh under tehsil obra of sonbhadra district

Read more
Silt clearance and removal of blockages from rd 0.10 km to rd 6.0 km at spots of main canal rawalpora.

Silt clearance and removal of blockages from rd 0.10 km to rd 6.0 km at spots of main canal rawalpora.

Read more
Comprehensive amc (annual maintenance contract) including operations for real time sensing and monitoring of water level and discharge of banbasa barrage, sarda sagar reservoir and sarda main canal from km. 0.00 to km. 45.00

Comprehensive amc (annual maintenance contract) including operations for real time sensing and monitoring of water level and discharge of banbasa barrage, sarda sagar reservoir and sarda main canal from km. 0.00 to km. 45.00

Read more
Construction of distribution system for 3499.70 ha. of cca including command area development (cad) of salandi left main canal from rd 30.547 km to 40.927 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Construction of distribution system for 3499.70 ha. of cca including command area development (cad) of salandi left main canal from rd 30.547 km to 40.927 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Read more
Improvement of ravi talkies to tankapani road dibakar marg from rd 0.00km to 1.915 k both side n periodical renewal coat and from rd 1.657 km to 1.915 km left side such as construction of rcc drain at left side for the year 2025-26.

Improvement of ravi talkies to tankapani road dibakar marg from rd 0.00km to 1.915 k both side n periodical renewal coat and from rd 1.657 km to 1.915 km left side such as construction of rcc drain at left side for the year 2025-26.

Read more
Construction of distribution system for 5765.34 ha. of cca including command area development(cad) of salandi left main canal from rd 71.505 km to 73.003 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Construction of distribution system for 5765.34 ha. of cca including command area development(cad) of salandi left main canal from rd 71.505 km to 73.003 km through under ground pipe line irrigation system (gravity flow) of abp

Read more
Construction of canal lining in main canal from rd 1329m to 3946.65m of sunaposi mip in bahalda block of mayurbhanj district under mmcly scheme for the year 2025-26

Construction of canal lining in main canal from rd 1329m to 3946.65m of sunaposi mip in bahalda block of mayurbhanj district under mmcly scheme for the year 2025-26

Read more
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,

1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material

Read more
Expression of interest for maintenance work including petty works to be d at site as per the necessity demand emergent nature for up keeping main ravi canal rd 52350 to 61104m sd 1st hiranagar

Expression of interest for maintenance work including petty works to be d at site as per the necessity demand emergent nature for up keeping main ravi canal rd 52350 to 61104m sd 1st hiranagar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise