Tender Details
Particulars | Details |
---|---|
Title |
Balance Work Of Providing And Laying Of Sewer Line In New Palam Vihar, Connection Gali Of Connection Manhole, Ward No. 1, Division Ii, Under Mcg. Recall
|
Description |
Balance Work Of Providing And Laying Of Sewer Line In New Palam Vihar, Connection Gali Of Connection Manhole, Ward No. 1, Division Ii, Under Mcg. Recall
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_435924_1 |
Reference Number |
2025D340ECC6 3BE1 4D9E B63B 822A303B3944285ULB |
Tender Fee | 2180 |
EMD | 48050 |
Tender Value | |
Place | Gurugram |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=513212 |
Start Date | March 24, 2025 17:50 |
End Date |
31/03/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreRain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Read moreA/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )
A/r and m.o to residential builiding under division no-3 at nabha estate shimla&#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&#x0d
Read moreComprehensive repair of jcos, ors md accn in piru vihar and other md accn in the area of age b/r-iii under ge (west) new delhi-10
Comprehensive repair of jcos, ors md accn in piru vihar and other md accn in the area of age b/r-iii under ge (west) new delhi-10
Read more10 dyce ds circle ropar 2025 26
Providing gang for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds division under ds circle pspcl ropar on per day basis
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreRectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Read moreConstruction of temporary toilets and bathrooms for the citizens in patre wali chaal under zone no. 07 ward no. 34.
Construction of temporary toilets and bathrooms for the citizens in patre wali chaal under zone no. 07 ward no. 34.
Read moreConstruction of c.c road in gali no. 05 and 06
Construction of c.c road in gali no. 05 and 06&#x0d at kot mohalla under ward 31
Read moreof your Industry type