Tender Details
Particulars | Details |
---|---|
Title |
21/Ee/Bd/Wand S/Kmda Of 2024 25
|
Description |
Emergent Leak Repairing Including Construction Of Valve Chamber Of 300 Mm Dia. C.I Sludge Pipe Line Replaced By Ms Pipe For Baranagar Kamarhati Water Treatment Plant, Phase I Within Wtp Area.
|
Organisation | KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY | State Govt. and UT |
Tender Id | 2025_KMDA_794071_1 |
Reference Number |
21/EE/BD/WandS/KMDA of 2024-25 Dated 02.01.2025 |
Tender Fee | 0 |
EMD | 2605 |
Tender Value | |
Place | 1, R.N. Tagore Road, Dakshineswar |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1761494 |
Start Date | January 08, 2025 20:45 |
End Date |
17/01/2025 ( Expired 114 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.
Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.
Read moreMtc and repairing of pipe line, hydrant post, platform, sluice valve chamber of existing dtw schemes at jalefa-betaga sector of satchand r.d block area within the sabroom sub-division of during 2025-26.(gr-i)
Mtc and repairing of pipe line, hydrant post, platform, sluice valve chamber of existing dtw schemes at jalefa-betaga sector of satchand r.d block area within the sabroom sub-division of during 2025-26.(gr-i)
Read moreRepair and maintenance infrastructure asunder water supply division. sub head. emergent work, repairing of c.i./d.i/h.s main line above 300 mm dia area under sub division-iv(w/s)
Repair and maintenance infrastructure asunder water supply division. sub head. emergent work, repairing of c.i./d.i/h.s main line above 300 mm dia area under sub division-iv(w/s)
Read moreRepair and maintenance infrastructure asunder water supply division.sub head. emergent work, repairing of c.i./d.i/h.s main line above 300 mm dia area under sub division iv(w/s)
Repair and maintenance infrastructure asunder water supply division.sub head. emergent work, repairing of c.i./d.i/h.s main line above 300 mm dia area under sub division iv(w/s)
Read moreReplacement of damaged water supply line in front of ms. bajaj auto by m.s.300 mm dia. pipe line.
Pimpri chinchwad industrial area m and r to water supply scheme replacement of damaged water supply line in front of ms. bajaj auto by m.s.300 mm dia. pipe line.
Read moreRepair/maintenance of 300/250/200 mm dia ms / gi pipe line as and when required before and during monsoon 2025 within mine area at bina project
Repair/maintenance of 300/250/200 mm dia ms / gi pipe line as and when required before and during monsoon 2025 within mine area at bina project
Read moreDi of existing water supply pipe line from glsr to kk-3 filter bed (passing through solar power plant at kk-5 old agent office), by laying 250 mm dia hdpe line along the road, mandamarri area, mancherial dist.
Di of existing water supply pipe line from glsr to kk-3 filter bed (passing through solar power plant at kk-5 old agent office), by laying 250 mm dia hdpe line along the road, mandamarri area, mancherial dist.
Read moreReplacement and repairing of delivery, ms pipe of 300 mm pipe line of unit no 934 pump of ps-9 section at madhuban coal washery under block-ii area, bccl
Replacement and repairing of delivery, ms pipe of 300 mm pipe line of unit no 934 pump of ps-9 section at madhuban coal washery under block-ii area, bccl
Read moreRealignment of rising main pipe-line by laying of 400mm dia and 300mm dia di (k9) pipe with road restoration and construction of valve chamber at dvc more within ward-22, under dmc.
Realignment of rising main pipe-line by laying of 400mm dia and 300mm dia di (k9) pipe with road restoration and construction of valve chamber at dvc more within ward-22, under dmc.
Read more22/ee/bd/wands/kmda of 2024-25 (2nd call)
Emergent leak repairing including construction of valve chamber of 300 mm dia. c.i sludge pipe line replaced by ms pipe for baranagar kamarhati water treatment plant, phase-i within wtp area.
Read moreof your Industry type