Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Tender 1 Completion Of Bc Choupal In Baniyawala 2 Completion Of Bc Choupal In Muzafat Khurd (Zp) Block Partapnagar
|
| Description |
Re Tender 1 Completion Of Bc Choupal In Baniyawala 2 Completion Of Bc Choupal In Muzafat Khurd (Zp) Block Partapnagar
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_368547_1 |
|
Reference Number |
20244393C642 25C3 4BA2 8C9E 2FDA2C386D07708DEV |
| Tender Fee | 2180 |
| EMD | 7000 |
| Tender Value | - |
| Place | BANIAWALA MUZAFAT KHURD |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=444256 |
| Start Date | March 14, 2024 21:30 |
| End Date |
Expired
20/03/2024
Expired 938 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Completion of sc choupal in...
Completion of sc choupal in odd colony ward no 2, mc radaur
Read moreAnnual plan-dpk project no -s0614/26-uzhavoor division veliyannor gp thmarakkadu anganvadi completion-general electrical work (re-tender)
Annual plan-dpk project no -s0614/26-uzhavoor division veliyannor gp thmarakkadu anganvadi completion-general electrical work (re-tender)
Read moreAnnual plan-annual plan chalissery gp 2026- 27, pro no 68 completion of puliyannjalil road -re concreeting-general civil work
Annual plan-annual plan chalissery gp 2026- 27, pro no 68 completion of puliyannjalil road -re concreeting-general civil work
Read moreRecarpeting of bm bc roads of c-1 and c-2 block palam vihar in ward no. 4, division 3a under mcg. re-call
Recarpeting of bm bc roads of c-1 and c-2 block palam vihar in ward no. 4, division 3a under mcg. re-call
Read moreRe-carpeting of roads with bc, replacement of tiles over sidewalks in blocks- d,e,f and residency green of greenwood city in ward-12 under mcg
Re-carpeting of roads with bc, replacement of tiles over sidewalks in blocks- d,e,f and residency green of greenwood city in ward-12 under mcg
Read moreInstallation of 05 (five) nos. steel pontoons at kachuberia for holding the gangways of semi-permanent jetties in connection with ganga sagar mela 2027 and re -placement of the same at their original positions after completion of mela operation.
Installation of 05 (five) nos. steel pontoons at kachuberia for holding the gangways of semi-permanent jetties in connection with ganga sagar mela 2027 and re -placement of the same at their original positions after completion of mela operation.
Read moreEstimate for re lining lining of wc by laying underground pipeline of ol rd 3810l of handiaya mr of barnala disty village ghanouri khurd,ghanouri kalan distt.sangrur laying and jointing of rcc ugpl system and other allied works in construction of wat
Estimate for re lining lining of wc by laying underground pipeline of ol rd 3810l of handiaya mr of barnala disty village ghanouri khurd,ghanouri kalan distt.sangrur laying and jointing of rcc ugpl system and other allied works in construction of wat
Read moreInstallation of 04 (four) nos. steel pontoons at lot - 8 for holding the gangway of semi-permanent jetties in connection with ganga sagar mela 2027 and re - placement of the same at their original positions after completion of mela operation.
Installation of 04 (four) nos. steel pontoons at lot - 8 for holding the gangway of semi-permanent jetties in connection with ganga sagar mela 2027 and re - placement of the same at their original positions after completion of mela operation.
Read moreSurfacing work (wmm, dbm, bc, tc, pc, rm) as per boq/ps btwn km 62.00 to km 67.00 re-alignment stretches take off pt km 62.00 (km 0.00) and meeting pt km 67.00 (km 5.00) and btwn km 54.00 to km 55.00 on galhar-sansari road in 118 rcc/project spk
Surfacing work (wmm, dbm, bc, tc, pc, rm) as per boq/ps btwn km 62.00 to km 67.00 re-alignment stretches take off pt km 62.00 (km 0.00) and meeting pt km 67.00 (km 5.00) and btwn km 54.00 to km 55.00 on galhar-sansari road in 118 rcc/project spk
Read morePdg and lyg of hmp ready mix bc 30 mm th incl cleaning rd surf applying tack coat wks with bm 75 mm for re-surf wks on various loc km 17.000 to km 35.200 km nt lngth 4.35 km on d-v-f and km 0.000 to 10.775 nt lngth 10.775 km on f-t rd 74 rcc 24 tf p
Pdg and lyg of hmp ready mix bc 30 mm th incl cleaning rd surf applying tack coat wks with bm 75 mm for re-surf wks on various loc km 17.000 to km 35.200 km nt lngth 4.35 km on d-v-f and km 0.000 to 10.775 nt lngth 10.775 km on f-t rd 74 rcc 24 tf p
Read moreof your Industry type