Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Flat Springs For 210 Mw Lmw Design Turbine 15 Items As Per The Specification
|
| Description |
Supply Of Flat Springs For 210 Mw Lmw Design Turbine 15 Items As Per The Specification
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_409544_1 |
|
Reference Number |
CE MTPS I EE SI AEE I OT 160 2023 24 |
| Tender Fee | 0 |
| EMD | 10800 |
| Tender Value | - |
| Place | MTPS-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=487294 |
| Start Date | January 13, 2024 00:25 |
| End Date |
Expired
29/01/2024
Expired 994 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares for hpt assembly fixtures 210 mw kwu turbine
Spares for hpt assembly fixtures 210 mw kwu turbine
Read moreSupply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Read moreProcurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Procurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreProcurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Read moreImplementation automatic generation control on 4 gas turbine generators of 1500 mw pps iii bawana
As per tender documents
Read moreProcurement of rotex make solenoid valves for different actuators installed at 210 mw, atps, mppgcl, chachai.
Procurement of rotex make solenoid valves for different actuators installed at 210 mw, atps, mppgcl, chachai.
Read moreWork contract for rebabitting of journal bearings (bearing no5) of generator of 210 mw atps chachai
Work contract for rebabitting of journal bearings (bearing no5) of generator of 210 mw atps chachai
Read moreDesign and development of technology demonstrator of 25kw part electric gas turbine generator
Design and development of technology demonstrator of 25kw part electric gas turbine generator
Read moreof your Industry type