Tender Details

Particulars Details
Title
Through Sleeper Replacement And Deep Screening On All Major Bridges In Sse/Ud Section In Non Ctr Locations.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78569875
Reference
Number
KR-KW-OL-W-2024-66-RB-RT1
Tender Fee 0
EMD 1.45 Lakh
Tender Value -
Place Navi Mumbai
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78569875/viewNitPdf_4779413.pdf

Start Date November 22, 2024 13:40
End Date
Expired 06/12/2024

Expired 681 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Deep screening, shallow screening, sleeper replacement etc under sse/ratnagiri section

Deep screening, shallow screening, sleeper replacement etc under sse/ratnagiri section

Read more
Deep screening of ballast and formation treatment work in lc 87 cutting between km 721/2-6 in sse/p/ud section

Deep screening of ballast and formation treatment work in lc 87 cutting between km 721/2-6 in sse/p/ud section

Read more
Standardisation of turnouts (total 200 nos.) - sleeper spacing, casual sleeper and fittings renewal, plate screw renewal, casual rail renewal for gapless crossing, deep screening, tamping and other miscellaneous works in the jurisdiction of assistant engineer/ballygunge under divisional engineer/hq/sealdah.

Standardisation of turnouts (total 200 nos.) - sleeper spacing, casual sleeper and fittings renewal, plate screw renewal, casual rail renewal for gapless crossing, deep screening, tamping and other miscellaneous works in the jurisdiction of assistant engineer/ballygunge under divisional engineer/hq/sealdah.

Read more
Through sleeper replacement (tsr) in verna tunnel, km 426/684 to 427/489 (total 1205 metre), including 200 metre approach on both sides of the tunnel, under sse/p.way/mao section phase-i

Through sleeper replacement (tsr) in verna tunnel, km 426/684 to 427/489 (total 1205 metre), including 200 metre approach on both sides of the tunnel, under sse/p.way/mao section phase-i

Read more
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,

Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,

Read more
Composite work (civil + p.way works) in connection with improvement and up-gradation of belha yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.

Composite work (civil + p.way works) in connection with improvement and up-gradation of belha yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.

Read more
Composite work (civil + p.way works) in connection with improvement and up-gradation of hathband yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/tilda.

Composite work (civil + p.way works) in connection with improvement and up-gradation of hathband yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/tilda.

Read more
Composite work (civil + p.way works) in connection with improvement and up-gradation of nipania yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.

Composite work (civil + p.way works) in connection with improvement and up-gradation of nipania yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.

Read more
Howrah division -trr(p) -9.839 km in locations: - she-vsu: sl 35.588 - 38.627 = 3.039 km, 63.000 - 67.000 = 4 km, 109.2 - 112.0 = 2.8 km tfr -4.337 tkm in locations: - bly - bdc : dn 8.815 - 8.827 = 0.012 km, 10.000 - 10.250 = 0.250 km, 16.148 - 16.187 = 0.039 km, rev 16.000 - 18.294 = 2.294 km, 8.942 - 9.066 = 0.124 km, 9.078 - 9.147 = 0.069 km, 9.563 - 9.674 = 0.111; up10.280 - 10.330 = 0.050 km, 23.190 - 24.238 = 1.048 km; bly - skg : dn chord 8.660 - 9.000 = 0.340 km , deep screening -1 in

Howrah division -trr(p) -9.839 km in locations: - she-vsu: sl 35.588 - 38.627 = 3.039 km, 63.000 - 67.000 = 4 km, 109.2 - 112.0 = 2.8 km tfr -4.337 tkm in locations: - bly - bdc : dn 8.815 - 8.827 = 0.012 km, 10.000 - 10.250 = 0.250 km, 16.148 - 16.187 = 0.039 km, rev 16.000 - 18.294 = 2.294 km, 8.942 - 9.066 = 0.124 km, 9.078 - 9.147 = 0.069 km, 9.563 - 9.674 = 0.111; up10.280 - 10.330 = 0.050 km, 23.190 - 24.238 = 1.048 km; bly - skg : dn chord 8.660 - 9.000 = 0.340 km , deep screening -1 in

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise