Tender Details
Particulars | Details |
---|---|
Title |
Pr Of Road From Machmara Krishnatilla Road To Pecharthal Kanchanpur Road Via Joymonipara Govt Fruit Garden During The Year 2024 2025 Total Length 3 50 Km Sh Patch Mettaling Carpeting And Seal Coat Work From Ch 0 00 Km To 3 50 Km
|
Description |
Pr Of Road From Machmara Krishnatilla Road To Pecharthal Kanchanpur Road Via Joymonipara Govt Fruit Garden During The Year 2024 2025 Total Length 3 50 Km Sh Patch Mettaling Carpeting And Seal Coat Work From Ch 0 00 Km To 3 50 Km
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_59446_1 |
Reference Number |
74/SE(I)/KGT/2024-25 |
Tender Fee | 4000 |
EMD | 1.38 Lakh |
Tender Value | |
Place | Pecharthal |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=60460 |
Start Date | March 12, 2025 21:30 |
End Date |
02/04/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Fdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.
Read moreMtc. of road from nh-208(rcc bridge) to patichari high school via madhukrishna para( l-1.50km) under the juridiction of pwd(randb) karbook sub-division during the year 2025-26/sh-wbm, re-carpeting, sand seal coating,surface drains and road protectio
Mtc. of road from nh-208(rcc bridge) to patichari high school via madhukrishna para( l-1.50km) under the juridiction of pwd(randb) karbook sub-division during the year 2025-26/sh-wbm, re-carpeting, sand seal coating,surface drains and road protectio
Read moreImprovement to road from batagaon to medical square (from ch. 0/500 km to 1/200 km, 1/750 km to 2/00 km, and 2/800 km to 3/200 km) for ensuing car-festival 2025 (such as providing wearing coat with sdbc)
Improvement to road from batagaon to medical square (from ch. 0/500 km to 1/200 km, 1/750 km to 2/00 km, and 2/800 km to 3/200 km) for ensuing car-festival 2025 (such as providing wearing coat with sdbc)
Read moreMtc. of road from tingharia to madhya para (l-0.63 km) under pwd(randb) ompi sub-division during the year 2025-26/sh- wbm-iii, carpeting, seal coat, protection work etc.
Mtc. of road from tingharia to madhya para (l-0.63 km) under pwd(randb) ompi sub-division during the year 2025-26/sh- wbm-iii, carpeting, seal coat, protection work etc.
Read moreMtc of road from ompi to raniabari (l- 0.42 km) under pwd (randb) ompi sub-division during the year 2025-26/sh- wbm-iii, re-carpeting, sand seal coat, 2 nos cd, drain work etc
Mtc of road from ompi to raniabari (l- 0.42 km) under pwd (randb) ompi sub-division during the year 2025-26/sh- wbm-iii, re-carpeting, sand seal coat, 2 nos cd, drain work etc
Read moreFdr/mtc.of roadsfrom jatanbari fire service road to nildhan para road under jatanbari pwd (randb) sub-division (ch. from 0.00 km to 1.00 km,length- 1.00 km) /sh- grouting, wbm-iii, through-out 25 mm carpeting , sand seal coating and other allied wo
Fdr/mtc.of roadsfrom jatanbari fire service road to nildhan para road under jatanbari pwd (randb) sub-division (ch. from 0.00 km to 1.00 km,length- 1.00 km) /sh- grouting, wbm-iii, through-out 25 mm carpeting , sand seal coating and other allied wo
Read moreMaintenance of road from i.t.d road to east narendranagar via anganwadi centre from ch.0.00km to ch.0.50km total length 0.50km ii. t.d road to hinskang panchayat approach road from ch.0.00 km to ch.0.050 km total length 0.050 km under damcherra s
Maintenance of road from i.t.d road to east narendranagar via anganwadi centre from ch.0.00km to ch.0.50km total length 0.50km ii. t.d road to hinskang panchayat approach road from ch.0.00 km to ch.0.050 km total length 0.050 km under damcherra s
Read moreof your Industry type