Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Structures And Construction Work Of Selective Canal Lining Of Akhatwada Minor Offtaking Kaudanyapur Dy.
|
Description |
Repairing Of Structures And Construction Work Of Selective Canal Lining Of Akhatwada Minor Offtaking Kaudanyapur Dy.
|
Organisation | Government of Maharashtra |
Tender Id | 2023_CEWRA_955624_3 |
Reference Number |
E-TENDER NOTICE NO.21 FOR 2023-24 SUBE |
Tender Fee | 2360 |
EMD | 19900 |
Tender Value | |
Place | AMRAVATI |
Link | https://mahatenders.gov.in |
Start Date | October 20, 2023 16:30 |
End Date |
03/11/2023 ( Expired 579 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreDesign and construction of metro station entry/exit structures integrated with commercial spaces and connecting through link bridge at sholinganallur and thoraipakkam station
Design and construction of metro station entry/exit structures integrated with commercial spaces and connecting through link bridge at sholinganallur and thoraipakkam station
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreWork of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Work of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Read moreWork of repairing, grouting and painting of m.s. angle of cable trenches of 400/220kv switchyard at 400kv sub-station, kashipur
Work of repairing, grouting and painting of m.s. angle of cable trenches of 400/220kv switchyard at 400kv sub-station, kashipur
Read moreWork of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.
Work of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.&#x0d
Read moreConstruction of 50 bedded critical care block g plus 3 at malda medical college and hospital_malda _sitc of lift
Name of work construction of 50 bedded critical care block g_plus_3 at malda medical college and hospital_malda _ sitc of lift
Read moreof your Industry type