Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
10 Tr Air Cooled Recirculating Water Chiller
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2025/B/6524149 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 05, 2025 15:58 |
| End Date |
Expired
26/08/2025
Expired 376 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply, installation, testing and commissioning of falling film chiller & evaporative condenser - 01 set at ranchi dairy, ranchi as per technical specification of tender document.
Supply, installation, testing and commissioning of falling film chiller & evaporative condenser - 01 set at ranchi dairy, ranchi as per technical specification of tender document.
Read moreAmc for water coolers voltage stabilizers and water purifiers uoa
Amc for water coolers voltage stabilizers and water purifiers uoa
Read moreFilling up water bodies (16 tanks) of javanagondanahalli hobli and gayathri reservoir for drinking water purpose and ground water development in hiriyur taluk of chitradurga district
Filling up water bodies (16 tanks) of javanagondanahalli hobli and gayathri reservoir for drinking water purpose and ground water development in hiriyur taluk of chitradurga district including detailed investigation & conducting survey, design and construction of civil works such as intake arrangement, jack well cum pump house, watchman room, approach road, chain link fencing & gate for pump house yard and design, supply and installation of electro mechanical components such as required capacity of pumps and motors, installation of 66 kv switch yard, 66/6.6 kv terminal bay, 66kv transmission line and design, supply and laying of ms/hdpe rising main pipeline and pressure distribution network canal crossing, road crossing, railway crossing / high way crossing by pipe jacking/horizontal drilling method, road restoration, utility shifting, surge analysis, tanks improvement works & facilitating for land acquisition, crop compensation, obtaining permissions from concerned departments and other statutory clearance from the competent authorities for the successful running of tank filling scheme for filling of water to the designated tanks, & other allied components including operation & maintenance for a period of five years after successfully commissioning of the scheme on turnkey basis.
Read moreSupply of air suspension parts to the divisions of the nwkrtc.
Supply of air suspension parts to the divisions of the nwkrtc.
Read moreKishanganj water supply scheme under amrut 2.0
Kishanganj water supply scheme under amrut 2.0
Read moreSupply and fixing water supply materials krn
Supplying of submersible motors , allied materials and fixing valves in pipe lines
Read moreAnnual repair and maintenance of air conditioner ceiling fan and exhaust fan for the year 2026 27 at 39th bn itbp sh repair and servicing of air conditioner
Annual repair and maintenance of air conditioner ceiling fan and exhaust fan for the year 2026 27 at 39th bn itbp sh repair and servicing of air conditioner
Read moreAnnual maintenance contract amc of vrf air conditioning system installed in fci complex uoa
Annual maintenance contract amc of vrf air conditioning system installed in fci complex uoa
Read moreDg ahilyanagar industrial area. m and r to centralized water supply scheme at ahilyanagar indl. area providing services for photo water meter reading, preparation and distribution of water bills, notices and other misc. works for 2 years period.
Dg ahilyanagar industrial area. m and r to centralized water supply scheme at ahilyanagar indl. area providing services for photo water meter reading, preparation and distribution of water bills, notices and other misc. works for 2 years period.
Read moreof your Industry type