Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Motorable Bridge 150 Mtrs Span Single Lane Over Ans River On Sounchal Gali To Chann Via Bhallar Road Including Construction Of Approaches (With Additional Span Of 75mtr) Under Nabard Ridf (Xxvii)
|
Description |
Construction Of Motorable Bridge 150 Mtrs Span Single Lane Over Ans River On Sounchal Gali To Chann Via Bhallar Road Including Construction Of Approaches (With Additional Span Of 75mtr) Under Nabard Ridf (Xxvii)
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWDJK_253184_1 |
Reference Number |
e-NIT No. 02 of 2024-25 Dated 15.07.2024 |
Tender Fee | 6000 |
EMD | 25.8 Lakh |
Tender Value | |
Place | Mahore |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=736113 |
Start Date | July 15, 2024 23:30 |
End Date |
05/08/2024 ( Expired 280 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of access road on nepal side (down stream) of the 110 meter double lane motor bridge under construction between india and nepal at charchhoom over kali river in dharchula assembly of pithoragarh district, under state plan.
Construction of access road on nepal side (down stream) of the 110 meter double lane motor bridge under construction between india and nepal at charchhoom over kali river in dharchula assembly of pithoragarh district, under state plan.
Read moreConstruction of a new 2 lane parallel bridge,approach road, and protection works near the damaged long bridge at kilometer 38 over the sot river on shahabad- bisauli-kachhla ganga ghat (nh-109) route in district badaun.
Construction of a new 2 lane parallel bridge,approach road, and protection works near the damaged long bridge at kilometer 38 over the sot river on shahabad- bisauli-kachhla ganga ghat (nh-109) route in district badaun.
Read moreSite selection detailed survey soil testing drawing design preparing of dpr and vetting from iit delhi kanpur mumbai varanasi etc. for construction of 200 m span double lane 70r class a motor bridge over alaknanda river near seetasain mulya villag
Site selection detailed survey soil testing drawing design preparing of dpr and vetting from iit delhi kanpur mumbai varanasi etc. for construction of 200 m span double lane 70r class a motor bridge over alaknanda river near seetasain mulya villag
Read moreBalance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for 2019-20
Balance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for the year 2019-
Read moreConstruction of new 4-lane h.l. r.c.c. major bridge at existing location of old bridge across sukhaniya river in km 52th on n.h.- 133e and its approaches having an aggregate lenght of 370m 147m bhagalpur side and 223m bhaljor side in district banka i
Construction of new 4-lane h.l. r.c.c. major bridge at existing location of old bridge across sukhaniya river in km 52th on n.h.- 133e and its approaches having an aggregate lenght of 370m 147m bhagalpur side and 223m bhaljor side in district banka i
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type