Tender Details
About Tender
🏗️ Tneb Limited Ttps Invites Bids For Inspection, Overhauling, And Commissioning Of Butterfly Valve Actuators 🚫 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Meticulous Inspection, Overhauling, And Commissioning Of Butterfly Valve Actuators For Manual Operation Within The Condenser System At Ttps. This Project Is Part Of The Annual Overhaul For The Year 2024 2025. 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm A Tender Fee Of Inr 1200 Is Applicable For The Bid Submission. Interested Bidders Must Demonstrate Expertise In Handling Such Mechanical Systems And Provide A Detailed Proposal, Including Technical Specifications, Pricing, And Timelines For Completion. Keywords: Tneb Limited, Ttps, Inspection, Overhauling, Butterfly Valve Actuators, Condenser System, Annual Overhaul, State Govt. And Ut, Tender, Bid, EmdParticulars | Details |
---|---|
Title |
Ttps Mech Ii Tm I Unit Iii Inspection Overhauling And Commissioning Of Butterfly Valve Actuators For Manual Operation In Condenser System During Annual Overhaul 2024 2025
|
Description |
Ttps Mech Ii Tm I Unit Iii Inspection Overhauling And Commissioning Of Butterfly Valve Actuators For Manual Operation In Condenser System During Annual Overhaul 2024 2025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_459594_1 |
Reference Number |
CE/TTPS/SE/M-II/No.308/2024-25 |
Tender Fee | 0 |
EMD | 1200 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546295 |
Start Date | July 03, 2024 19:30 |
End Date |
18/07/2024 ( Expired 321 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreLoading and unloading of 20 ton ci test weight during routine annual inspector testing for renewal of stamping and verification of 05 nos, road weighbridge (kusunda old road wb, gondudih old road wb. ena-ii. gondudih-iii and kds-ii road wb near kds-i
Loading and unloading of 20 ton ci test weight during routine annual inspector testing for renewal of stamping and verification of 05 nos, road weighbridge (kusunda old road wb, gondudih old road wb. ena-ii. gondudih-iii and kds-ii road wb near kds-i
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreSupply erection and commissioning of condenser west cooling water outlet pipe of dia. 1624 mm connecting the backwash line valve in unit i
Supply erection and commissioning of condenser west cooling water outlet pipe of dia. 1624 mm connecting the backwash line valve in unit i
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read moreNctps 1 operation circle ca div cwph renewal of worn out deteriorated man hole cover plates in suction bay of cwps for unit i ii and iii
Nctps 1 operation circle ca div cwph renewal of worn out deteriorated man hole cover plates in suction bay of cwps for unit i ii and iii
Read moreAnnual repair of f.a.o.c. building, staff quarters class-iii and iv, secty. residence and internal roads, i/p/f and c/p/f etc. in ngm dhand (for the year 2025-26).
Annual repair of f.a.o.c. building, staff quarters class-iii and iv, secty. residence and internal roads, i/p/f and c/p/f etc. in ngm dhand (for the year 2025-26).
Read moreMtps i bm unit i annual overhauling 2025 26 overhaul of esp ab and cd pass internals and related works
Mtps i bm unit i annual overhauling 2025 26 overhaul of esp ab and cd pass internals and related works
Read moreMtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Mtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Read moreManning and operation outsourcing 33 kv grid shankar vihar sub stn and outsourcing for services of electrician to maintain supply of 11/.415 kv system in the area of vrc-i, ii, iii, offrs md accn vikram vihar , anuj vihar , cao pool, shankar vihar ar
Manning and operation outsourcing 33 kv grid shankar vihar sub stn and outsourcing for services of electrician to maintain supply of 11/.415 kv system in the area of vrc-i, ii, iii, offrs md accn vikram vihar , anuj vihar , cao pool, shankar vihar
Read moreof your Industry type