Tender Details
About Tender
🏗️ Tneb Limited Ttps Invites Bids For Inspection, Overhauling, And Commissioning Of Butterfly Valve Actuators 🚫 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Meticulous Inspection, Overhauling, And Commissioning Of Butterfly Valve Actuators For Manual Operation Within The Condenser System At Ttps. This Project Is Part Of The Annual Overhaul For The Year 2024 2025. 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm A Tender Fee Of Inr 1200 Is Applicable For The Bid Submission. Interested Bidders Must Demonstrate Expertise In Handling Such Mechanical Systems And Provide A Detailed Proposal, Including Technical Specifications, Pricing, And Timelines For Completion. Keywords: Tneb Limited, Ttps, Inspection, Overhauling, Butterfly Valve Actuators, Condenser System, Annual Overhaul, State Govt. And Ut, Tender, Bid, EmdParticulars | Details |
---|---|
Title |
Ttps Mech Ii Tm I Unit Iii Inspection Overhauling And Commissioning Of Butterfly Valve Actuators For Manual Operation In Condenser System During Annual Overhaul 2024 2025
|
Description |
Ttps Mech Ii Tm I Unit Iii Inspection Overhauling And Commissioning Of Butterfly Valve Actuators For Manual Operation In Condenser System During Annual Overhaul 2024 2025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_459594_1 |
Reference Number |
CE/TTPS/SE/M-II/No.308/2024-25 |
Tender Fee | 0 |
EMD | 1200 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546295 |
Start Date | July 03, 2024 19:30 |
End Date |
18/07/2024 ( Expired 278 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Read moreEmandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Read morePre and during monsoon cleaning of existing drainage system of ph- iv, ph- ii / iii premises and chp area for the year 2025-26 at stps, sarni
Pre and during monsoon cleaning of existing drainage system of ph- iv, ph- ii / iii premises and chp area for the year 2025-26 at stps, sarni
Read moreAnnual contract for routine operation in shift and r/c/b maintenance work of 6.6 kv swgr of main plant area, maintenance of spbd, cable laying and termination work, o and m of lift and elevators of unit- i to iv, ctpp chhabra.
Annual contract for routine operation in shift and r/c/b maintenance work of 6.6 kv swgr of main plant area, maintenance of spbd, cable laying and termination work, o and m of lift and elevators of unit- i to iv, ctpp chhabra.
Read moreEddy current testing and fluorescent test of all condenser tubes at unit 1 during overhauling in aug 2025
Eddy current testing and fluorescent test of all condenser tubes at unit 1 during overhauling in aug 2025
Read moreDeployment of ex bhel or ex ntpc persons for supervision in overhauling of unit 9 bmd-i and bmd-ii 2x250mw dtps kasimpur aligarh
Deployment of ex bhel or ex ntpc persons for supervision in overhauling of unit 9 bmd-i and bmd-ii 2x250mw dtps kasimpur aligarh
Read moreRoutine breakdown capital mtc work of l t motors valve actuators lt switchgear bus duct and dc system and cabling work at stps stage i ii iii and iv
Routine breakdown capital mtc work of l t motors valve actuators lt switchgear bus duct and dc system and cabling work at stps stage i ii iii and iv
Read moreService for valve installation at unit 1 phe of cccw boiler and trubine various location during u 1 overhauling aug 2025
Service for valve installation at unit 1 phe of cccw boiler and trubine various location during u 1 overhauling aug 2025
Read moreSupply,erection,testing and commissioning of following works in adilabad (erstwhile) district on turnkey basis. lot-i: 132/33kv substation tallapet (ii) 132kv dc line (13km) for making lilo of 132kv dharmapuri-luxettipet to 132/33kv ss tallapet. lot-ii: 220kv dc line (3.145km) for making lilo of one circuit of 220kv jagityal-nirmal line to 400kv ss nirmal. lot-iii: (i) making lilo of 132kv pochampadu-nirmal with 2nd circuit stringing (33km) to 132kv ss burugupally and connected bay.
Supply,erection,testing and commissioning of following works in adilabad (erstwhile) district on turnkey basis. lot-i: 132/33kv substation tallapet (ii) 132kv dc line (13km) for making lilo of 132kv dharmapuri-luxettipet to 132/33kv ss tallapet. lot-ii: 220kv dc line (3.145km) for making lilo of one circuit of 220kv jagityal-nirmal line to 400kv ss nirmal. lot-iii: (i) making lilo of 132kv pochampadu-nirmal with 2nd circuit stringing (33km) to 132kv ss burugupally and connected bay.
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augumentation in connection to accommodate fhtc at p.h. no.-i, ii, iii iv (new) under dakshin akhratala w/s scheme under bloc
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augumentation in connection to accommodate fhtc at p.h. no.-i, ii, iii iv (new) under dakshin akhratala w/s scheme under bloc
Read moreof your Industry type