Long Term Rectification Of Mo Rth Identified Blackspots 17 And Removal Of 2 At Grade Junctions And Allied Works On Existing 4 6 Lane Hyderabad Vijayawada Section Of Nh 65 From Km.40.000 Km.221.500 In Telangana On Epc Mode
|
Description |
Long Term Rectification Of Mo Rth Identified Blackspots 17 And Removal Of 2 At Grade Junctions And Allied Works On Existing 4 6 Lane Hyderabad Vijayawada Section Of Nh 65 From Km.40.000 Km.221.500 In Telangana On Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2023_NHAI_176416_1 |
Reference Number |
|
Tender Fee | 40000 |
EMD | 3.26 Crore |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=193135 |
Start Date | December 02, 2023 00:00 |
End Date |
06/02/2024 ( Expired 441 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreLong term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreProviding short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Read moreRectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode
Rectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreRehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode
Rehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode.
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)