Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
State Plan 2022 23 Optimization Of Production And Transmission Cwss To Kuttanadu Renovation Of The Existing 14 Mld Water Treatment Plant
|
| Description |
Renovation Of The Existing 14 Mld Water Treatment Plant Including Changing The Filter Media To Dual Media Raw Water Unit Clear Water Unit Clarifiers Filter Bed Unit And Chlorination Unit For 14 Mld Treatment Plant At Neerettupuram In Thalavady Grama
|
| Organisation | Government of Kerala |
| Tender Id | 2023_KWA_581046_1 |
|
Reference Number |
RE-E-TENDER NO.189/2022-23/EE/PH/TVLA |
| Tender Fee | 2800 |
| EMD | 50000 |
| Tender Value | - |
| Place | P.H. DIVISION, KWA, THIRUVALLA |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | June 12, 2023 15:30 |
| End Date |
Expired
03/07/2023
Expired 1200 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradtion of existing efflument treatment plant
Upgradtion of existing efflument treatment plant
Read moreReplacement of existing con...
Replacement of existing conductor 0.4 sq. inch acsr conductor with equivalent ht
Read moreReplacement of existing con...
Replacement of existing conductor 0.5 sq acsr conductor with equivalent htls conductor of current carrying capacity of 1200 amp on turnkey basis.
Read moreManjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Manjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Read moreSoil testing for upgradation of existing 66kv aluva kizhakkambalam dc feeder from thamarachalpuram to kizhakkambalam substation to 110kv level by replacing existing line and towers with 110kv line and tower.
Soil testing for upgradation of existing 66kv aluva kizhakkambalam dc feeder from thamarachalpuram to kizhakkambalam substation to 110kv level by replacing existing line and towers with 110kv line and tower.
Read moreReplacement of existing acsr zebra conductor by htls conductor (to carry minimum current 1200 a) i.r.o 220 kv transmission lines-1. jeerat - barasat d/c (ckm- 42.00),2. ktpp-food park d/c (ckm-104.00),3. jangalpur-food park d/c (ckm-12.00),4. subhasg
Replacement of existing acsr zebra conductor by htls conductor (to carry minimum current 1200 a) i.r.o 220 kv transmission lines-1. jeerat - barasat d/c (ckm- 42.00),2. ktpp-food park d/c (ckm-104.00),3. jangalpur-food park d/c (ckm-12.00),4. subhasg
Read moreReplacement of existing age-old and troubleprone ac machines by supply installation testing and commissioning of 13 nos. new split type ac machines (10 nos. 3 tr split ac machine and 3 nos. 2 tr split ac machine) at control room and plcc room
Replacement of existing age-old and troubleprone ac machines by supply installation testing and commissioning of 13 nos. new split type ac machines (10 nos. 3 tr split ac machine and 3 nos. 2 tr split ac machine) at control room and plcc room
Read moreStrengthening of existing pile type foundation by open pit foundation for 220kv sultanpur-patti transmission line
Strengthening of existing pile type foundation by open pit foundation for 220kv sultanpur-patti transmission line
Read moreConstruction of 110kv lilo line to 110kv mukunda sub-station by utilizing 110kv dc towers from the tapping point of existing 110kv munirabad-2 line for a distance of 12.62 kms along with construction of terminal bay at 110/11kv mukkunda sub-station in sindhanur taluk, raichur district. (including civil works) of all materials/equipments
Construction of 110kv lilo line to 110kv mukunda sub-station by utilizing 110kv dc towers from the tapping point of existing 110kv munirabad-2 line for a distance of 12.62 kms along with construction of terminal bay at 110/11kv mukkunda sub-station in sindhanur taluk, raichur district. (including civil works) of all materials/equipments
Read moreGroup mediclaim insurance service - students hospitalization for accident & emergency treatments, domiciliary treatment, all pre-existing illness no
Group mediclaim insurance service - students hospitalization for accident & emergency treatments, domiciliary treatment, all pre-existing illness no
Read moreof your Industry type