Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm Ii Acp Fabrication And Erection Of Water Collecting Tray In Unit V Air Washer And Cleaning The Spray Pipe With Nozzle In Unit Iv Air Washer
|
Description |
Ttps Operation Circle Mpm Ii Acp Fabrication And Erection Of Water Collecting Tray In Unit V Air Washer And Cleaning The Spray Pipe With Nozzle In Unit Iv Air Washer
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_393361_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.192/23-24 |
Tender Fee | 0 |
EMD | 1500 |
Tender Value | |
Place | O/o SE/O/TTPS |
Link | https://tntenders.gov.in |
Start Date | November 27, 2023 22:35 |
End Date |
12/12/2023 ( Expired 519 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii tm ii unit iv renewal of boiler feed pump cartridge assembly model fk 6d 30 in bfp 4b including alignment and allied works
Ttps mech ii tm ii unit iv renewal of boiler feed pump cartridge assembly model fk 6d 30 in bfp 4b including alignment and allied works
Read moreTtps mech ii ahp unit iii pdfac system erection and commissioning of oil injected air cooled screw type single stage 160kw rotary air compressor with related accessories for unit iii pdfac system
Ttps mech ii ahp unit iii pdfac system erection and commissioning of oil injected air cooled screw type single stage 160kw rotary air compressor with related accessories for unit iii pdfac system
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreSteel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Read moreNctps i se m ii circle ichs dn design engineering supply fabrication and erection of additional trestle with bracings of 5b1 with pile foundation for supporting the existing severely corroded weaken trestle no 5a of conveyor 12 a b on emergency basis
Nctps i se m ii circle ichs dn design engineering supply fabrication and erection of additional trestle with bracings of 5b1 with pile foundation for supporting the existing severely corroded weaken trestle no 5a of conveyor 12 a b on emergency basis
Read moreDismantling, mechanical cleaning and re-erection of valves, flanged and non flanged pipe sizes of 50 to 200 nb in pulp mill mechanical at tnpl unit - 1.
Dismantling, mechanical cleaning and re-erection of valves, flanged and non flanged pipe sizes of 50 to 200 nb in pulp mill mechanical at tnpl unit - 1.
Read moreDrilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submersible pump with accessories and laying and jointing of hdpe pipe line work at: janachaitanya park-65 phase -ii, circle-11, rajendr nagar, charminar zone, ubd, ghmc for the year 2025-26
Drilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submersible pump with accessories and laying and jointing of hdpe pipe line work at :- janachaitanya park-65 phase-ii, circle-11, rajendra nagar, charminar zone, ubd, ghmc for the year 2025-26
Read moreDrilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submercible pump with accessories and laying and jointing of hdpe pipe line work at: janachaitanya park-78 phase -ii, circle-11, rajendra nagar, charminar zone, ubd, ghmc for the year 2025-26
Drilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submercible pump with accessories and laying and jointing of hdpe pipe line work at : janachaitanya park-78, phase -ii, circle-11, rajendranagar, charminar zone, ubd, ghmc for the year 2025-26
Read moreMtps i m i circle ca fire protection checking of deluge valves cleaning of spray nozzles in emulsifyre system of gts uats mots cots and dots of unit i to iv etc
Mtps i m i circle ca fire protection checking of deluge valves cleaning of spray nozzles in emulsifyre system of gts uats mots cots and dots of unit i to iv etc
Read moreTtps operation circle mpm i units i and ii emptying of coal from rc bunkers 1a to 1f and 2a to 2f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps
Ttps operation circle mpm i units i and ii emptying of coal from rc bunkers 1a to 1f and 2a to 2f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps
Read moreof your Industry type