Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Grizzly Bar For Sinter Machine Discharge Chute
|
| Description |
|
| Organisation | Steel Authority of India Limited | Ministry of Steel |
| Tender Id | GEM/2025/B/6535712 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 05, 2025 20:27 |
| End Date |
Expired
18/08/2025
Expired 424 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Repair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery
Repair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery
Read moreEchp-i-removal of frequent wet coal chocking in secondary crusher a, b c vibrex screen 20a, 20b, 20c, discharge chute a, b c, fine coal chute a, b c, and screen feed chutes a, b c at secondary crusher house-i
Echp-i-removal of frequent wet coal chocking in secondary crusher a, b c vibrex screen 20a, 20b, 20c, discharge chute a, b c, fine coal chute a, b c, and screen feed chutes a, b c at secondary crusher house-i
Read moreBar alloy steel round,bar round1,bar round2,bar round3,bar round4,bar round5,bar round6,bar round7,bar round8
Bar alloy steel round,bar round1,bar round2,bar round3,bar round4,bar round5,bar round6,bar round7,bar round8
Read moreArc chute assly. for electro magnetic contactor etc.
Arc chute assly. for electro magnetic contactor etc.
Read moreAi-based vision system for continuous sinter mean size prediction on conveyor bfc2.
Ai-based vision system for continuous sinter mean size prediction on conveyor bfc2.
Read moreGauge and discharge observations
Continuation of gauge and discharge observations on baira nallah near village shalli for sai kothi-i (15 mw) hydro electric project for the period of 5 months 11 days (21/10/2026 to 31/03/2027)
Read moreof your Industry type