Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Erection Testing Commissioning Of New Gaseous Fire Suppression System Inergen Ig 541 In Ucb Control Room Davr And Battery Room At 15.5 M And 24 V Battery Room At 10.5 M Elevation In Unit I
|
| Description |
Supply Erection Testing Commissioning Of New Gaseous Fire Suppression System Inergen Ig 541 In Ucb Control Room Davr And Battery Room At 15.5 M And 24 V Battery Room At 10.5 M Elevation In Unit I
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_587939_1 |
|
Reference Number |
CE-164/25-26/NCTPS-I |
| Tender Fee | 0 |
| EMD | 5 Lakh |
| Tender Value | |
| Place | NCTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=702670 |
| Start Date | August 02, 2025 17:00 |
| End Date |
Expired
07/08/2025
Expired 322 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Refilling of clean agent gases in existing gaseous fire suppression system
Refilling of clean agent gases in existing gaseous fire suppression system in record room library data centre in high court building at gomti nagar lucknow
Read moreRenewal of existing, obsolete inergen gas distribution system in zone 1 and zone 2 of unit i, ii control room including supply, erection, testing and commissioning for fire protection system.
Please refer tender documents
Read moreDesign, manufacturing, supply, erection, testing and commissioning of fire hydrant system- phase i for rsps2 project at tnpl unit i
Design, manufacturing, supply, erection, testing and commissioning of fire hydrant system- phase i for rsps2 project at tnpl unit i
Read moreEngineering, design, supply, installation, commissioning and testing of co2 based fire suppression system for c and m record room and fire detection system for c and m office.
Engineering, design, supply, installation, commissioning and testing of co2 based fire suppression system for c and m record room and fire detection system for c and m office.
Read moreDesign, manufacturing, supply, erection, testing and commissioning of fire hydrant system- phase i for rsps 2 project at tnpl unit i
Design, manufacturing, supply, erection, testing and commissioning of fire hydrant system- phase i for rsps 2 project at tnpl unit i
Read moreRenewal of existing obsolete inergen gas distribution system in zone 3 zone 4 zone 5 and zone 6 of operation area of control room and battery room of unit i and ii including supply erection testing and commissioning for fire protection system
Please refer tender documents
Read moreDesign manufacturing supply erection testing and commissioning of fire hydrant system phase ii for rsps2 project at tnpl unit i
Design manufacturing supply erection testing and commissioning of fire hydrant system phase ii for rsps2 project at tnpl unit i
Read moreEchs dn supply erection testing and commissioning of new fire alarm
Echs dn supply erection testing and commissioning of new fire alarm control panel with all accessories after dismantling of existing old failed fire alarm system in echs control room lcss-2
Read moreNctps i operation circle o and e division fire fighting unit i design fabrication erection of new detector network for inside cable gallery at 0 mtr elevation and 10 point 5 mtr elevation
Nctps i operation circle o and e division fire fighting unit i design fabrication erection of new detector network for inside cable gallery at 0 mtr elevation and 10 point 5 mtr elevation
Read moreEm echs dn supply erection testing and commissioning of new fire alarm
Em echs dn supply erection testing and commissioning of new fire alarm control panel with all accessories after dismantling of existing old failed fire alarm system in echs control room lcss 2
Read moreof your Industry type