Tender Details
Particulars | Details |
---|---|
Title |
Amc For Statcon Make Battery Chargers Installed For Dc System Of Unit I To Iv, 400 Kv Switchyard Phase I And Ii, Plcc Of Phase I And Ii And Silo Area Phase I, Ctpp.
|
Description |
Amc For Statcon Make Battery Chargers Installed For Dc System Of Unit I To Iv, 400 Kv Switchyard Phase I And Ii, Plcc Of Phase I And Ii And Silo Area Phase I, Ctpp.
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1090 |
EMD | 8100 |
Tender Value | |
Place | CTPP, RVUNL, Chhabra |
Link |
AAAAAAAAAA Login to view |
Start Date | April 15, 2025 18:30 |
End Date |
30/04/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreSupply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Read moreWork contract for repairing and restoration of siemens make dc drive for 125kw dc motor of apron feeder installed at wagon tippler installed at wagon tippler sgtps mppgcl birsinghpur.
Work contract for repairing and restoration of siemens make dc drive for 125kw dc motor of apron feeder installed at wagon tippler installed at wagon tippler sgtps mppgcl birsinghpur.
Read morePeriodical maintenance and repair of ei in the type i to type iv quarters including the kunjaban ps fire service building and state disaster management building at capital complex agartala for the year 2025 26
Periodical maintenance and repair of ei in the type i to type iv quarters including the kunjaban ps fire service building and state disaster management building at capital complex agartala for the year 2025 26
Read moreIndependent safety assessment services for signalling and train control system for reach-6, phase-2a and phase-2b and platform screen door/gates systems of reach-5, reach-6, phase-2a and phase-2b of phase-ii.
Independent safety assessment services for signalling and train control system for reach-6, phase-2a and phase-2b and platform screen door/gates systems of reach-5, reach-6, phase-2a and phase-2b of phase-ii.
Read moreProcurement of various spares for indure make clinker grinder, hydro ejector and bottom ash hopper feed gate installed at ash handling system of 210 mw atps mppgcl chachai.
Procurement of various spares for indure make clinker grinder, hydro ejector and bottom ash hopper feed gate installed at ash handling system of 210 mw atps mppgcl chachai.
Read moreSupply ,erection, testing and commissioning works for interconnection arrangement (tie feeder) of 6.6kv cubical switchgear panels incorporating vcb( vacuum circuit breaker rating- 12kv, 3150amp.,isc- 40ka at the rate 1sec.) for phase -i to phase- i
Supply ,erection, testing and commissioning works for interconnection arrangement (tie feeder) of 6.6kv cubical switchgear panels incorporating vcb( vacuum circuit breaker rating- 12kv, 3150amp.,isc- 40ka at the rate 1sec.) for phase -i to phase- i
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreSelection of a project management unit (pmu) to program manage implementation by system integrator for the design, development, implementation, operation, and maintenance of a traffic incident management system (tims) on the chardham mahamarg
Selection of a project management unit (pmu) to program manage implementation by system integrator for the design, development, implementation, operation, and maintenance of a traffic incident management system (tims) on the chardham mahamarg
Read moreSupply, erection ,testing and commissioning of battery banks, 220 v/2000 ah, 220 v/500 ah and 220v/200ah tubular (lead acid), hdp-ii and accessories and dismantling and buy back of existing installed exide battery bank of ctpp ,chhabra
Supply, erection ,testing and commissioning of battery banks, 220 v/2000 ah, 220 v/500 ah and 220v/200ah tubular (lead acid), hdp-ii and accessories and dismantling and buy back of existing installed exide battery bank of ctpp ,chhabra
Read moreof your Industry type