Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 400 Seater Working Women Hostel
|
Description |
Construction Of 400 Seater Working Women Hostel At New Shillong Township, Mawdiangdiang, And 200 Seater Each Working Women Hostel At Jowai,Byrnihat, Tura In Meghalaya
|
Organisation | Urban Affairs Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1.31 Lakh |
EMD | 2.64 Crore |
Tender Value | |
Place | As per tender Document |
Link |
AAAAAAAAAA Login to view |
Start Date | June 12, 2025 22:30 |
End Date |
25/06/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Construction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreRehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreConstruction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreConstruction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreof your Industry type