Tender Details
Particulars | Details |
---|---|
Title |
Comprehensive Maintenance Contract For Kyosan Make Electronic Interlocking Signalling System At Mgr Control Room (Cabin A And B), Meja Crossing Station For The Period Of 4 Months
|
Description |
Comprehensive Maintenance Contract For Kyosan Make Electronic Interlocking Signalling
System At Mgr Control Room (Cabin A And B), Meja Crossing Station For The Period Of 4 Months.
|
Organisation | Meja Urja Nigam Pvt Ltd | Public Sector Undertakings |
Tender Id | 2024_MUNPL_207799_1 |
Reference Number |
Enq/24-25/70 Dated 10.09.2024 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | MUNPL, PRAYAGRAJ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=227326 |
Start Date | September 10, 2024 19:00 |
End Date |
12/09/2024 ( Expired 247 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Request for proposal e-tender for comprehensive annual maintenance contract of access control system, make gallagher at punjab and sind bank, corporate office, block 3, nbcc office towers, east kidwai nagar, new delhi 110023
Request for proposal e-tender for comprehensive annual maintenance contract of access control system, make gallagher at punjab and sind bank, corporate office, block 3, nbcc office towers, east kidwai nagar, new delhi 110023
Read moreComprehensive maintenance and repair to certain b/r works for zone 3 and zone 4 at gandhinagar mil station
Comprehensive maintenance and repair to certain b/r works for zone 3 and zone 4 at gandhinagar mil station
Read moreSupply, installation, testing and commissioning (sitc) of 4nos of strong motion accelerograph (sma) at dam site of dhauliganga power station including comprehensive annual maintenance contract (camc) for 5 years after the warrantee period of 1yr
Supply, installation, testing and commissioning (sitc) of 4nos of strong motion accelerograph (sma) at dam site of dhauliganga power station including comprehensive annual maintenance contract (camc) for 5 years after the warrantee period of 1yr
Read moreRequest for proposal for erection of fogging / misting system at hadapsar waste transfer station and allied waste management facilities for the purpose of odour control with operation and maintenance for period of 5 years
Request for proposal for erection of fogging / misting system at hadapsar waste transfer station and allied waste management facilities for the purpose of odour control with operation and maintenance for period of 5 years
Read moreProvision of temperature and humidity control system for detention room in building p33 and repositioning and reinstallation of 19 nos ac out door units at top wall side alongwith associated cables and pipelines of remote operation station
Provision of temperature and humidity control system for detention room in building p33 and repositioning and reinstallation of 19 nos ac out door units at top wall side alongwith associated cables and pipelines of remote operation station
Read moreCombined annual rate contract for general maintenance, round the clock monitoring of pidws and cctv system and up-keeping of station facilities at serpl khunti
Combined annual rate contract for general maintenance, round the clock monitoring of pidws and cctv system and up-keeping of station facilities at serpl khunti
Read moreAnnual rate contract for operation and maintenance of medical psa oxygen generation plant and medical oxygen piping system installed at dpa hospital, gopalpuri for the period of 5 years
Annual rate contract for operation and maintenance of medical psa oxygen 
 generation plant and medical oxygen piping system installed at dpa hospital, 
 gopalpuri for the period of 5 years
Read moreOperation and comprehensive maintenance service contract for 17 nos. icl make 250 scmh compressors installed at cng stations under cgd saran ga for 3 months
Operation and comprehensive maintenance service contract for 17 nos. icl make 250 scmh compressors installed at cng stations under cgd saran ga for 3 months
Read moreMaintenance of lift room,toilets, washbasins including scavenging works in gf,1st and 2nd floor of the central office complex main building at tatabad, cbe for the period of 3 months from 01.06.2025 or from the date of utilization whichever is later.
Maintenance of lift room,toilets, washbasins including scavenging works in gf,1st and 2nd floor of the central office complex main building at tatabad, cbe for the period of 3 months from 01.06.2025 or from the date of utilization whichever is later.
Read moreContract for providing 4 nos of manpower have i st class or ii nd calss ibr boiler operator for operation and maintenance of 2 nos 4 ton iaec make boilers and 1 no 2.8 ton forbes marshall make boiler and steamlines and valves for 2 yrs at ambattur dy
Contract for providing 4 nos of manpower have i st class or ii nd calss ibr boiler operator for operation and maintenance of 2 nos 4 ton iaec make boilers and 1 no 2.8 ton forbes marshall make boiler and steamlines and valves for 2 yrs at ambattur dy
Read moreof your Industry type