Tender Details

Particulars Details
Title
Drilling And Commissioning Of 05 Nos. Hand Pump At Ob Dump Rehab Site Under Rajmahal Area.
Description
Drilling And Commissioning Of 05 Nos. Hand Pump At Ob Dump Rehab Site Under Rajmahal Area.
Organisation Coal India Limited (CIL)
Tender Id 2023_ECL_293935_1
Reference
Number
ECL/RJML/GM/AE(C)/23-24/427 Dt-16.11.2023
Tender Fee -
EMD 8000
Tender Value -
Place Online
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date November 17, 2023 17:30
End Date
Expired 27/11/2023

Expired 1055 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Heightening of boundary wall and laying paver block at jaggyasthal of lohar tola of lalmatia colony rehab site under rajmahal area.

Heightening of boundary wall and laying paver block at jaggyasthal of lohar tola of lalmatia colony rehab site under rajmahal area.

Read more
Hand held drilling machine

Hand held drilling machine

Read more
Repair of compost pits at dump site of mc kartarpur

Repair of compost pits at dump site of mc kartarpur

Read more
Nagar pacnhayat sirsi me dump site par legacy waste processing karya.

Nagar pacnhayat sirsi me dump site par legacy waste processing karya.

Read more
Custom bid for services - extension of 3300v ht oh line towards active ob dump area for lighting purpose at kolgaon ocm

Custom bid for services - extension of 3300v ht oh line towards active ob dump area for lighting purpose at kolgaon ocm

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling of tubewell at various place in ward no. 05

Drilling of tubewell at various place in ward no. 05

Read more
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area

Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise