Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Delivery Of Different Boiler Tubes Required For Unit 5 Overhauling For Kolaghat Thermal Power Station
|
| Description |
Supply And Delivery Of Different Boiler Tubes Required For Unit 5 Overhauling For Kolaghat Thermal Power Station
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_714761_1 |
|
Reference Number |
WBPDCL/KTPS/NIT/E3013/24-25 |
| Tender Fee | 0 |
| EMD | 42600 |
| Tender Value | - |
| Place | GM Building, KTPS, Mecheda, Purba Medinipur |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1569654 |
| Start Date | August 03, 2024 15:30 |
| End Date |
Expired
12/08/2024
Expired 790 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Tggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreBmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreProcurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2
Procurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreof your Industry type