Tender Details

Particulars Details
Title
Construction Work Of Drain Slab And Interlocking From Mukhlal House To Rambadan House In Buchchu House In No. 05 Maunath Bhanjan Ward No. 07 Pardahan Dalit Basti.
Description
Construction Work Of Drain Slab And Interlocking From Mukhlal House To Rambadan House In Buchchu House In No. 05 Maunath Bhanjan Ward No. 07 Pardahan Dalit Basti.
Organisation State Urban Development Agency | State Govt. and UT
Tender Id 2025_SUDA_1033897_1
Reference
Number
30-27
Tender Fee 2483
EMD 2.48 Lakh
Tender Value
Place Mau
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1871946
Start Date April 29, 2025 23:30
End Date

28/05/2025 ( Expired 36 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Read more
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh

Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh

Read more
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Read more
Construction of cc road at ward no 10 dulare ahirwar to guddibai and ramsevak to arjun and ghasiram to raju malvi house municipal council narmadapuram mp.

Construction of cc road at ward no 10 dulare ahirwar to guddibai and ramsevak to arjun and ghasiram to raju malvi house municipal council narmadapuram mp.

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
7-construction work of rcc drain from hari narayans house to natthus house on the left side of biribirhan road.

Construction work of rcc drain from hari narayans house to natthus house on the left side of biribirhan road.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise