Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Table,Height,Table Top,Legs,Wood Lipping
|
| Description |
|
| Organisation | NA | Ministry of Skill Development and Entrepreneurship |
| Tender Id | GEM/2024/B/4502337 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 18, 2024 20:33 |
| End Date |
Expired
29/01/2024
Expired 989 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NEW GRAND FURNITURE
305046
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | CHANDINI FURNITURE | - | 30-01-2024 17:02:36 | MII MSE | Qualified |
| 2 | FATHIMA FASHION FURNITURES | - | 22-01-2024 17:37:59 | MII MSE | Qualified |
| 3 | INSPIRE OFFICE SYSTEMS | - | 29-01-2024 14:32:09 | MII MSE | Qualified |
| 4 | MASS FURN | - | 25-01-2024 09:54:08 | MII MSE | Qualified |
| 5 | NEW GRAND FURNITURE | - | 26-01-2024 10:10:51 | MII MSE | Qualified |
| 6 | PRITI INTERNATIONAL LIMITED | - | 28-01-2024 10:23:51 | MII MSE | Qualified |
| 7 | south india gem traders | - | 25-01-2024 10:20:48 | MII MSE | Qualified |
| 8 | tamil nadu gem traders | - | 25-01-2024 09:56:22 | MII MSE | Qualified |
| 9 | WAVES INTERIORS | - | 29-01-2024 16:08:40 | MII MSE | Qualified |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Table | NA | BOQ Item | 18 | ₹ 177444.000 |
| height | NA | BOQ Item | 18 | ₹ 19782.000 |
| table top | NA | BOQ Item | 18 | ₹ 39600.000 |
| legs | NA | BOQ Item | 18 | ₹ 32220.000 |
| wood lipping | NA | BOQ Item | 18 | ₹ 36000.000 |
Development of road from karma height to tapavan stp
Development of road from karma height to tapavan stp
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreProviding and fixing of false ceiling, ply wood partitions, aluminium partitions, scientific doors at golden jublie building and bajaj best center, jntuh, kukatpally, hyderabad.
Providing and fixing of false ceiling, ply wood partitions, aluminium partitions, scientific doors at golden jublie building and bajaj best center, jntuh, kukatpally, hyderabad.
Read moreConstruction of table drain and roqad marking at parvath nagar junction via ht line road in ward number 232- madhapur circle-50, kpz, cmc
Construction of table drain and roqad marking at parvath nagar junction via ht line road in ward number 232- madhapur circle-50, kpz, cmc
Read moreSupply, installation and handover of archery, athletics, badminton, basketball, cycling, football, gatka, gymnastics, hockey, kalarippayattu, mallakhamb, softball, swimming, table tennis, tennis, thang ta, volleyball, weightlifting and yogasana equipment
Supply, installation and handover of archery, athletics, badminton, basketball, cycling, football, gatka, gymnastics, hockey, kalarippayattu, mallakhamb, softball, swimming, table tennis, tennis, thang ta, volleyball, weightlifting and yogasana equipment
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreDevelopment of madhapur graveyard in harijana basti by providing of burning unit, pooja mandap, dimpudu kallam, kerb walls, seating galleries, lord siva statue, ash storage room, wood storage room, toilet blocks, rain water harvesting pit etc, in ward no.232, madhapur circle-50, kukatpally zone
Development of madhapur graveyard in harijana basti by providing of burning unit, pooja mandap, dimpudu kallam, kerb walls, seating galleries, lord siva statue, ash storage room, wood storage room, toilet blocks, rain water harvesting pit etc, in ward no.232, madhapur circle-50, kukatpally zone
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type