Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
S.I.T.C. Of 2 Nos. 15 Passenger Lift For Foot Over Bridge At President Aashiyana Dehradun.
|
| Description |
S.I.T.C. Of 2 Nos. 15 Passenger Lift For Foot Over Bridge At President Aashiyana Dehradun.
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_pwd_79713_1 |
|
Reference Number |
148/NIVIDA Dt. 27.01.2025 |
| Tender Fee | 3540 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Dehradun |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=95073 |
| Start Date | January 30, 2025 22:30 |
| End Date |
Expired
18/03/2025
Expired 574 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair of dawaran uri foot bridge over river jhelum
Repair of dawaran uri foot bridge over river jhelum
Read moreConstruction of foot over bridge (fob) at digha railway station.
Construction of foot over bridge (fob) at digha railway station.
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreConstruction of foot bridge over zamoo nallah bagori at lower mudhar block kastigarh (untied grant)
Construction of foot bridge over zamoo nallah bagori at lower mudhar block kastigarh (untied grant)
Read moreProviding structural and architectural consultancy for constt.of 40 mtr foot bridge over river sewa mohra gatt (bani)
Please refer in boq
Read moreConstruction of road from hayan bridge to cherwan foot bridge
Construction of road from hayan bridge to cherwan foot bridge
Read moreConstruction of steel foot bridge over local cherra at baithangbari vc of jubarajnagar rd block under rd dharmanagar division
Construction of steel foot bridge over local cherra at baithangbari vc of jubarajnagar rd block under rd dharmanagar division
Read moreReplacement of existing lift, e.i. and elv services installed in mini sectt. at kaithal (pdg. 1 nos. 13 passenger lift and 1 nos. 10 passenger lift only). recall
Replacement of existing lift, e.i. and elv services installed in mini sectt. at kaithal (pdg. 1 nos. 13 passenger lift and 1 nos. 10 passenger lift only). recall
Read moreComprehensive servicing and maintenance of 2nos. 13 persons capacity kone make passenger lift in adr building, 3nos. of 13persons capacity passenger lift in law chamber and 3nos. 13persons capacity kone make passenger lift in madurai bench of madras
Comprehensive servicing and maintenance of 2nos. 13 persons capacity kone make passenger lift in adr building, 3nos. of 13persons capacity passenger lift in law chamber and 3nos. 13persons capacity kone make passenger lift in madurai bench of madras
Read moreProvision of passenger lift in collectorate building at tiruvannamalai district
Provision of 10 persons passenger lift arrangements in the district collectorate building at tiruvannamalai in tiruvannamalai district
Read moreof your Industry type