Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Hiring Of Passive Infrastructure Rf Link For Lastmile Connectivity To Dvc
|
| Description |
|
| Organisation | POWER GRID Corporation OF INDIA Limited | Ministry of Power |
| Tender Id | GEM/2024/B/5638244 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 28, 2024 16:20 |
| End Date |
Expired
18/12/2024
Expired 667 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Sitc of rf link for ils at thoothukudi airport with 4 years camc
Sitc of rf link for ils at thoothukudi airport with 4 years camc
Read moreLand acquisition, ists grid connectivity and power evacuation infrastructure along with all statutory approvals for setting up solar power projects ac
Land acquisition, ists grid connectivity and power evacuation infrastructure along with all statutory approvals for setting up solar power projects ac
Read moreConst of internal approach path, drainage crossings and associated access infrastructure for providing safe and all-weather connectivity and pedestrian connectivity to the 400kvs/s resid colony, kashipur, integration with the existing drainage system
Const of internal approach path, drainage crossings and associated access infrastructure for providing safe and all-weather connectivity and pedestrian connectivity to the 400kvs/s resid colony, kashipur, integration with the existing drainage system
Read moreImprovement of 25 kv ohe infrastructure at prayagraj chheoki (pcoi) and link junction (lkjn) yard in prayagraj division.
Improvement of 25 kv ohe infrastructure at prayagraj chheoki (pcoi) and link junction (lkjn) yard in prayagraj division.
Read moreProvisioning, deplyoment commssioning and operationalization of high-bandwidth internet connectivity infrastructure at multiple designated locations of umc including end-to-end network intergaration, service availability performance monitoring, techn
Provisioning, deplyoment commssioning and operationalization of high-bandwidth internet connectivity infrastructure at multiple designated locations of umc including end-to-end network intergaration, service availability performance monitoring, techn
Read moreTelecom work in construction office at bhagalpur for improving connectivity and providing telecom infrastructure in connection with various doubling and new line projects in malda division of eastern railway.
Telecom work in construction office at bhagalpur for improving connectivity and providing telecom infrastructure in connection with various doubling and new line projects in malda division of eastern railway.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConst of internal approach path, drains for providing all-weather vehicular, pedestrian connectivity to the control room building and associated electrical infrastructure at 132kv s/s, almora, including provisions for safe movement of oandm personnel
Const of internal approach path, drains for providing all-weather vehicular, pedestrian connectivity to the control room building and associated electrical infrastructure at 132kv s/s, almora, including provisions for safe movement of oandm personnel
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
Read moreWorks contract for provision of 4 nos. manpower for monitoring rf, fiber and lan network link and it related equipment maintenance works at offices covered in respect of perambalur circle for a period of one year.
Works contract for provision of 4 nos. manpower for monitoring rf, fiber and lan network link and it related equipment maintenance works at offices covered in respect of perambalur circle for a period of one year.
Read moreof your Industry type