Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fin Assembly (Welding) To Ofdc Drg. No. Sk 3335 For Tail Unit Tb 250 / Tail Unit 250 Mod I
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/5612520 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 15, 2024 21:51 |
| End Date |
Expired
25/11/2024
Expired 692 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Procurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Procurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Read moreTaking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Read moreFin assembly (welding) to ofdc drg. no. sk-3335 for tail unit tb 250 / tail unit 250-mod-i.
Read more
Cone ring & locating pin assembly to ofdc drg. no. sk-3333 (a) for tail unit tb 250/ tail unit tb 2
Read more
of your Industry type