Tender Details

Particulars Details
Title
Complete Repairing And Rewinding Of 20 Hp Motor, 550 V Si.No. Mhp/Af/04 At Maheshpur Colliery Under Govindpur Area
Description
Complete Repairing And Rewinding Of 20 Hp Motor, 550 V Si.No. Mhp/Af/04 At Maheshpur Colliery Under Govindpur Area
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_324283_1
Reference
Number
BCCL/GA-III/AM (EnM) E-TENDER/2024-25/152
Tender Fee 0
EMD 430
Tender Value -
Place Govindpur Area Office
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336151

Start Date December 31, 2024 16:30
End Date
Expired 07/01/2025

Expired 646 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rewinding of 15kva, 550v/220v lighting transformer, of view point area of east basuria colliery

Rewinding of 15kva, 550v/220v lighting transformer, of view point area of east basuria colliery

Read more
(1) complete repairing and rewinding of 02(two) nos. c.g. make 20hp s50volt, 2900rpm auxiliary fan motor and (2) complete repairing and rewinding of bharat bijlee make 12.5hp 550volt 950rpm motor of kumardihi a colliery under bankola area.

(1) complete repairing and rewinding of 02(two) nos. c.g. make 20hp s50volt, 2900rpm auxiliary fan motor and (2) complete repairing and rewinding of bharat bijlee make 12.5hp 550volt 950rpm motor of kumardihi a colliery under bankola area.

Read more
Complete rewinding and repairing of primary and secondary breaker of andrew yule make 315 kva 3.3kv-550v sl no sspay03 transwitch transformer at shyamsundarpur colliery

Complete rewinding and repairing of primary and secondary breaker of andrew yule make 315 kva 3.3kv-550v sl no sspay03 transwitch transformer at shyamsundarpur colliery

Read more
Complete rewinding of 10 h.p, 550v, 960 rpm, 3 phase crompton parkinson make motor at filter plant khas kusunda of gkk colliery under kusunda area

Complete rewinding of 10 h.p, 550v, 960 rpm, 3 phase crompton parkinson make motor at filter plant khas kusunda of gkk colliery under kusunda area

Read more
Complete rewinding and repairing of 167 hp 550 volts motor of east baseriya colliery under kusunda area

Complete rewinding and repairing of 167 hp 550 volts motor of east baseriya colliery under kusunda area

Read more
Complete repairing and rewinding of 93.3kw,120hp marathon make 1470rpm 550volt pump motor of nakrakonda kumardihi b colliery under bankola area

Complete repairing and rewinding of 93.3kw,120hp marathon make 1470rpm 550volt pump motor of nakrakonda kumardihi b colliery under bankola area

Read more
Complete repairing /rewinding and overhauling of pullen make 120 hp 550 volt 2900 rpm submersible motor and 6 stage pump of dobari colliery.

Complete repairing /rewinding and overhauling of pullen make 120 hp 550 volt 2900 rpm submersible motor and 6 stage pump of dobari colliery.

Read more
Complete repairing and overhauling of one (01) no. submersible starter 550 volt 175 h.p.sl. no.48 local id. no. bar/sub/str/04 sb make and rewinding of auto transformer 3 phase at 6 pit bararee colliery of amal.joyrampur colliery under lodna area.

Complete repairing and overhauling of one (01) no. submersible starter 550 volt 175 h.p.sl. no.48 local id. no. bar/sub/str/04 sb make and rewinding of auto transformer 3 phase at 6 pit bararee colliery of amal.joyrampur colliery under lodna area.

Read more
Taking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span

Taking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span

Read more
Complete repairing and rewinding of 30kva,550v/220v two phase,si.no mhp/tr/12 used for lighting purpose for maheshpur basti at maheshpur colliery under govindpur area

Complete repairing and rewinding of 30kva,550v/220v two phase,si.no mhp/tr/12 used for lighting purpose for maheshpur basti at maheshpur colliery under govindpur area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise