Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Constructing Ipb Street For Liwan Kabristan In Ward 8 Under Mc Sonipat.
|
Description |
Estimate For Constructing Ipb Street For Liwan Kabristan In Ward 8 Under Mc Sonipat.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_355462_1 |
Reference Number |
202405ABEFFA 9088 4A7D B4B7 9458E98CF983292ULB |
Tender Fee | 2180 |
EMD | 24000 |
Tender Value | |
Place | Sonepat |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=430829 |
Start Date | February 17, 2024 17:30 |
End Date |
24/02/2024 ( Expired 454 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreHiring of consultancy firm for multi-purpose disaster shelter need assessment, development plan, shelter design and operational assistance in uttarakhand state under u-prepare project
Hiring of consultancy firm for multi-purpose disaster shelter need assessment, development plan, shelter design and operational assistance in uttarakhand state under u-prepare project
Read moreIe services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)
Ie services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)
Read moreIe services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Ie services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Read moreof your Industry type