Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Khardonkala Ugli Shujalpur Road Length 32.76 K.M. On Epc Mode
|
| Description |
Construction Of Khardonkala Ugli&Amp#X0d
Shujalpur Road Length 32.76 K.M. On Epc Mode&Amp#X0d
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2025_PWDRB_398445_1 |
|
Reference Number |
07/CE/GN/24-25 dated 24-01-2025 |
| Tender Fee | 51180 |
| EMD | 61.41 Lakh |
| Tender Value | - |
| Place | EE SHAJAPUR |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=468901 |
| Start Date | January 25, 2025 15:30 |
| End Date |
Expired
12/03/2025
Expired 534 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConstruction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Read moreConstruction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read moreConstruction of proposed centre of excellence of fire testing, training and research laboratory at iit patna, bihar (on epc basis)
Construction of proposed centre of excellence of fire testing, training and research laboratory at iit patna, bihar (on epc basis)
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreConstruction of bitumen road karnisar to towards 28 wali puli width 5.50 mtr length 850 mtr mla lad
Construction of bitumen road karnisar to towards 28 wali puli width 5.50 mtr length 850 mtr mla lad
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read moreConstruction of box culvert on budhera to (t) mirjapur road in bidar tq.
Construction of box culvert on budhera to (t) mirjapur road in bidar tq.
Read moreWidening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Read moreof your Industry type