Tender Details
Particulars | Details |
---|---|
Title |
Mtps 1 Bm Unit Iv Inspection Renewal Of Guide Bearing In Air Pre Heater A And B Sides And Dismantling Cleaning Inspection And Reassembling Of Air Seal Assembly Etc And Other Related Works During Aoh 2024 25
|
Description |
Mtps 1 Bm Unit Iv Inspection Renewal Of Guide Bearing In Air Pre Heater A And B Sides And Dismantling Cleaning Inspection And Reassembling Of Air Seal Assembly Etc And Other Related Works During Aoh 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_461215_1 |
Reference Number |
CE/MTPS-I/SE/M-I/BM/ OT. 52 / 2024-25 |
Tender Fee | 0 |
EMD | 6400 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=548144 |
Start Date | July 09, 2024 14:30 |
End Date |
15/07/2024 ( Expired 323 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of air pre heaters seals complete assembly with seal tabs diaphragm seals and holding strips for aph unit i ii and iv 6 items
Supply of air pre heaters seals complete assembly with seal tabs diaphragm seals and holding strips for aph unit i ii and iv 6 items &#x0d
Read moreMtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Read moreModification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Read moreMtps i bm unit i boiler pressure parts aoh 2025 tube thickness survey water wall buffing providing platform renewal of shroudings and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 tube thickness survey water wall buffing providing platform renewal of shroudings and allied works
Read moreMtps i bm unit i aoh 2025 26 renewal reconditioning of various saw tooth expansion joints in fg ducts and air ducts and other related works etc in both a and b sides
Mtps i bm unit i aoh 2025 26 renewal reconditioning of various saw tooth expansion joints in fg ducts and air ducts and other related works etc in both a and b sides
Read moreMtps i bm unit i boiler pressure parts aoh 2025 overhauling of secondary air dampers scanner air fans and its damper flap gate etc
Mtps i bm unit i boiler pressure parts aoh 2025 overhauling of secondary air dampers scanner air fans and its damper flap gate etc
Read moreMtps i bm unit i rotating parts aoh 2025 26 overhauling reconditioning of cerm and eerm gear boxes id pa fd fans gate actuators and other related works etc
Mtps i bm unit i rotating parts aoh 2025 26 overhauling reconditioning of cerm and eerm gear boxes id pa fd fans gate actuators and other related works etc
Read moreMtps i bm unit i boiler pressure parts aoh 2025 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit i boiler pressure parts aoh 2025 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Read moreof your Industry type