Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Aluminium Conductor P.V.C. Sheathed Cable 1100 Volts Grouting With M.S. Clamps Of 3.5x630 Sqm. Size Complete In All Respects At Dhankuwari Pump Canal Including All Cost Of Material As Directed By Engineer In Charge
|
Description |
Providing And Laying Aluminium Conductor P.V.C. Sheathed Cable 1100 Volts Grouting With M.S. Clamps Of 3.5x630 Sqm. Size Complete In All Respects At Dhankuwari Pump Canal Including All Cost Of Material As Directed By Engineer In Charge
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id | 2025_UPIDM_1001751_4 |
Reference Number |
09/EE/MLCD/VNS/2024-25 |
Tender Fee | 854 |
EMD | 21000 |
Tender Value | |
Place | Executive Engineer Minor lift canal division vns |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1784995 |
Start Date | February 04, 2025 17:30 |
End Date |
10/02/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Read moreStrenthaning of sobandha left minor from 1.570 km to 2.070 km by brick lining work at sogai pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Strenthaning of sobandha left minor from 1.570 km to 2.070 km by brick lining work at sogai pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Read moreBank protection work of river bank from 20.00 m to 40.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Bank protection work of river bank from 20.00 m to 40.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreStrenthaning of main canal by stone boulder piching from 0.250 km to 0.400 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Strenthaning of main canal by stone boulder piching from 0.250 km to 0.400 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Read moreConstruction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Construction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreProviding and laying aluminium conductor p.v.c. sheathed cable 1100 volts grouting with m.s. clamps of 3.5x630 sqm. size complete in all respects at dhankuwari pump canal including all cost of material as directed by engineer in charge
Providing and laying aluminium conductor p.v.c. sheathed cable 1100 volts grouting with m.s. clamps of 3.5x630 sqm. size complete in all respects at dhankuwari pump canal including all cost of material as directed by engineer in charge
Read moreConcrete payment block interlocking work in compound at balua pump canal including all cost of material, (excluding cement ) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.
Concrete payment block interlocking work in compound at balua pump canal including all cost of material, (excluding cement ) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.
Read moreRepairing h.d.p.e pipe line leakage of 1000 mm dia and 630 mm dia damaged h.d.p.e pipe replaced by m.s pipe with m.s flang. at dhankuwari pump canal including all cost of material, labour, t and p used, complete in all respect as per drawing provide
Repairing h.d.p.e pipe line leakage of 1000 mm dia and 630 mm dia damaged h.d.p.e pipe replaced by m.s pipe with m.s flang. at dhankuwari pump canal including all cost of material, labour, t and p used, complete in all respect as per drawing provide
Read moreCostruction of ramp and staire case at newajganj east pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.
Costruction of ramp and staire case at newajganj east pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.
Read moreConstruction of ramp and stair at head of baira east pump canal including all cost of material (excluding cement and brick ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Construction of ramp and stair at head of baira east pump canal including all cost of material (excluding cement and brick ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreof your Industry type