Tender Details

Particulars Details
Title
Supervision Erection And Commissioning Of Unloading Arm,Spare Parts For 2 Years Opertng Unloading A
Description
Organisation NA | Ministry of Petroleum and Natural Gas
Tender Id GEM/2025/B/6443208
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date July 12, 2025 01:04
End Date
Expired 01/08/2025

Expired 437 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Buyer Name: Muhammadfaizan Shaikh
Ministry: Ministry Of Petroleum And Natural Gas
Department: Na
Organisation: Hindustan Petroleum Corporation Ltd
Similar Tenders
Supply pof spare parts for raw water pump

Supply pof spare parts for raw water pump

Read more
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Read more
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit

Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv switchyard of nagarjunasagar main power house, telangana

Read more
Operation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagar

Operation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagarkurnool (district)

Read more
Spare parts for wagon tippler side arm charger

Spare parts for wagon tippler side arm charger

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise