Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Up Gradation Of Bari To Samba Km 0/000 To 10/000 (Package No Hp 04 443) And Up Gradation Of Ext Daroh Garh Jmula Upto Bairghat Road Km 0/000 To 12/000 (Package No Hp 04 445) Under Pmgsy Iii (Batch I, 2023 24) In Distt Kangra (H.P.)
|
| Description |
Improvement, Passing Places, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Cc Pavement, Tarring And Road Signs Etcetra Including Five Year Routine Maintenance).
|
| Organisation | National Rural Road Development Agency (NRRDA) |
| Tender Id | 2023_CEHP_129396_1 |
|
Reference Number |
NIT No.14914-32 DT.28-11-2023 |
| Tender Fee | 5000 |
| EMD | 35.78 Lakh |
| Tender Value | - |
| Place | SE, 5th Circle, HPPWD Palampur. |
| Link |
View Original Tender Notice
https://pmgsytenders.gov.in |
| Start Date | December 01, 2023 00:00 |
| End Date |
Expired
21/12/2023
Expired 1028 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Up-gradation of link road from bani to parola km 0/000 to 0/740
Providng and laying prime coat ,tack,along with 30mm thick bituminous concrete in km 0/0000 to 0/450). (ii) link road from lohar kainchi to rihad km 0/000 to 1/100(sh providng and laying prime coat ,tack,along with 30mm thick bituminous conc
Read moreUp-gradation of link road from dhanain to panjog km 0/000 to 2/645.
Providng and laying prime coat ,tack,along with 30 mm thick bituminous concrete in km 0/810 to 1/235). (ii) .up-gradation of link road from shohawal to drabla km 0/000 to 2/500. (sh providng and laying prime coat ,tack,along with 30mm thick bi
Read moreRestoration of rain damages on link road massal to parmar basti in km 0/000 to 2/000 in district kangra (hp) (sh-construction of retaining wall and cc pavement in between km at rd 0/765 to 2/000).(4332-1.1)
Restoration of rain damages on link road massal to parmar basti in km 0/000 to 2/000 in district kangra (hp) (sh-construction of retaining wall and cc pavement in between km at rd 0/765 to 2/000).(4332-1.1)
Read moreRestoration of rain damages on mumta bhadrehar road in km 0/000 to 1/852 in district kangra (hp)(under pdna 2025) (sh-construction of breast wall with u-shape drain in between at rd 0/800 to 0/920) (4442-2.1)
Restoration of rain damages on mumta bhadrehar road in km 0/000 to 1/852 in district kangra (hp)(under pdna 2025) (sh-construction of breast wall with u-shape drain in between at rd 0/800 to 0/920) (4442-2.1)
Read moreConstruction of gate at tharu on link road nh-154 to village tharu in tehsil nagrota bagwan district kangra (hp) (sh-construction of gate at rd 0/000)
Construction of gate at tharu on link road nh-154 to village tharu in tehsil nagrota bagwan district kangra (hp) (sh-construction of gate at rd 0/000)
Read moreUp-gradation of bari to samba km 0/000 to 10/000 (package no hp-04-443) and up-gradation of ext daroh garh jmula upto bairghat road km 0/000 to 12/000 (package no hp-04-445) under pmgsy-iii (batch-i, 2023-24) in distt kangra (h.p.)
Improvement, passing places, missing cross drainage, side drain, parapets, crash barrier, cc pavement, tarring and road signs etcetra including five year routine maintenance)
Read moreUp-gradation of luddu to gharmani road km 0/000 to 7/000 (package no hp-02-07),up-gradation of sahoo to parotha padhar road km 0/000 to 5/000 (package no hp-02-12)andup-gradation of sahran ran road km 0/000 to 6/000 (package no hp-02-13) under pmgsy-
Up-gradation of luddu to gharmani road km 0/000 to 7/000 (package no hp-02-07),up-gradation of sahoo to parotha padhar road km 0/000 to 5/000 (package no hp-02-12)andup-gradation of sahran ran road km 0/000 to 6/000 (package no hp-02-13) under pmgsy-
Read moreUp-gradation of kosri dhupkiara jhunga devi road km 0/000 to 11/000 (package no hp-04-422), up-gradation of nallana to gadiara road km 0/000 to 5/000 (package no hp-04-425) under pmgsy-iii (batch-i, 2023-24) in distt kangra (h.p.)
Sub head- improvement, passing places, missing cross drainage, side drain, parapets, crash barrier, cc pavement, tarring and road signs etcetra including five year routine maintenance
Read moreUp-gradation of darwah to chakloon road km 0/000 to 6/000 (package no hp-04-437) and up-gradation of daultpur to sunni road km 0/000 to 7/000 (package no hp-04-438) under pmgsy-iii (batch-i, 2023-24) in distt kangra (h.p.)
Improvement, passing places, missing cross drainage, side drain, parapets, crash barrier, cc pavement, tarring and road signs etcetra including five year routine maintenance)
Read moreUp-gradation of darwah to chakloon road km 0/000 to 6/000 (package no hp-04-437) and up-gradation of daultpur to sunni road km 0/000 to 7/000 (package no hp-04-438) under pmgsy-iii (batch-i, 2023-24) in distt kangra (h.p.)
Improvement, passing places, missing cross drainage, side drain, parapets, crash barrier, cc pavement, tarring and road signs etcetra including five year routine maintenance).
Read moreof your Industry type