Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit I To V Attending Boiler Tube Puncture In Unit I To V Boiler From The Date Of Handing Over Of Site On Or After 01 04 2024 To 31 03 2025 Or Till The Date Of Completion Of Entire Quantity Which Ever Comes Earlier
|
Description |
Ttps Mech Ii Bm Unit I To V Attending Boiler Tube Puncture In Unit I To V Boiler From The Date Of Handing Over Of Site On Or After 01 04 2024 To 31 03 2025 Or Till The Date Of Completion Of Entire Quantity Which Ever Comes Earlier
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_415200_1 |
Reference Number |
CE/TTPS/SE/M-II/No.68/2024-25 |
Tender Fee | 0 |
EMD | 36800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=493994 |
Start Date | January 30, 2024 19:30 |
End Date |
05/02/2024 ( Expired 441 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreKtps-v-general-engaging of jeep along with driver on hire basis,round the clock for unit emergencies and for the official utilization of de/ general /ktps-v stage under the control of de/general/ktps-v stage with mileage up to 2500 km/month including fuel charges, driver salary, maintenance charges, road taxes, insurance etc, for the period from 01/04/2025 (or from actual date of utilization) to 31/03/2026.(reserved for st contractors)
Ktps-v-general-engaging of jeep along with driver on hire basis,round the clock for unit emergencies and for the official utilization of de/ general /ktps-v stage under the control of de/general/ktps-v stage with mileage up to 2500 km/month including fuel charges, driver salary, maintenance charges, road taxes, insurance etc, for the period from 01/04/2025 (or from actual date of utilization) to 31/03/2026.(reserved for st contractors)
Read moreKtps-v-i and c-engaging of jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 km per month for the conveyance of divisional engineer/ic division/ktps-v stage for the period of one year from 01-04-2025 (or from actual date of utilizaion) to 31-03-2026.(reserved for st category)
Ktps-v-i and c-engaging of jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 km per month for the conveyance of divisional engineer/i and c division/ktps-v stage for the period of one year from 01-04-2025 (or from actual date of utilizaion) to 31-03-2026.(reserved for st category)
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Ttps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Read moreTtps mech ii ahp attending rubber lining works in unit i ii iii bah sea water supplied pipes lines fittings bah manhole door acces door and over flow tank for the period from 01 04 2025 to 31 03 2026
Ttps mech ii ahp attending rubber lining works in unit i ii iii bah sea water supplied pipes lines fittings bah manhole door acces door and over flow tank for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii ahp picking and disposal of hard clinkers discharged from boiler at the strainer provided in the slurry trenches of unit iv v for the period from 01 04 2025 to 31 03 2026
Ttps mech ii ahp picking and disposal of hard clinkers discharged from boiler at the strainer provided in the slurry trenches of unit iv v for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii ahp unit i ii iii attending breakdown works in sea water booster pumps in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii ahp unit i ii iii attending breakdown works in sea water booster pumps in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii ahp break down overhauling of equipments of ash slurry pumps of unit iv v for the period from 01 04 2025 to 31 03 2026
Ttps mech ii ahp break down overhauling of equipments of ash slurry pumps of unit iv v for the period from 01 04 2025 to 31 03 2026
Read moreof your Industry type