Erection Of 3.3 Kv Overhead Lines From Transformer Room To Pumping Site For Smooth Pumping Operation Of C 2 Patch At Abns Colliery.
|
| Description |
Erection Of 3.3 Kv Overhead Lines From Transformer Room To Pumping Site For Smooth Pumping Operation Of C 2 Patch At Abns Colliery.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_344464_1 |
|
Reference Number |
BCCL/EJA/ENM/E Tender/2025-26/91 |
| Tender Fee | 0 |
| EMD | 5259 |
| Tender Value | |
| Place | E. J. Area, Bhowra |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=357066 |
| Start Date | September 22, 2025 23:30 |
| End Date |
Expired
27/09/2025
Expired 261 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Transgrid down stream works at 110kv substation terls repositioning of 20 mva, 110/11 kv transformer unit 2 to enable double bus upgrade at 110 kv substation, terls
Transgrid down stream works at 110kv substation terls repositioning of 20 mva, 110/11 kv transformer unit 2 to enable double bus upgrade at 110 kv substation, terls
Read moreConstruction of 2no pps includes complete supply etc of 4x315mva 33/400 kv transformer, construction of 2nos bays of 400kv transmission lines for pps-i,ii each 33kv side metering, switchyards, control rooms civil (turnkey project) at bodana solarpark
Construction of 2no pps includes complete supply etc of 4x315mva 33/400 kv transformer, construction of 2nos bays of 400kv transmission lines for pps-i,ii each 33kv side metering, switchyards, control rooms civil (turnkey project) at bodana solarpark
Read moreNiet-07 of 2026-2027 (2nd call)
Operation , maintenance of various dia d.i./m.s. w/s pumping main in aa-iii (from bs-i to ohrs at aa-iii a, iiib, iiic and different plots like unitech, rosedale, uem, iti, saporjee, arts acr, garden vista, infosys, nsg etc.)including flow balancing
Read moreDesign supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Read moreDisposal of scrap from various facilities of sea side buildings to tvs store and debris disposal to designated disposal area in side barc premises at north site, barc trombay, mumbai-for year 2025-2027.
Disposal of scrap from various facilities of sea side buildings to tvs store and debris disposal to designated disposal area in side barc premises at north site, barc trombay, mumbai-for year 2025-2027.
Read moreProviding survey, supply, design ,erection testing and comm. of 11 kv ht line, dtr with civil works for providing sop to ev charging station at hrtc bus stand joginder nagar in (e) section local under esd no i, hpsebl joginder nagar.
Providing survey, supply, design ,erection testing and comm. of 11 kv ht line, dtr with civil works for providing sop to ev charging station at hrtc bus stand joginder nagar in (e) section local under esd no i, hpsebl joginder nagar.
Read moreTender for con 1 phase to 3 phase and prov new st 8 mtr pole to raising of ab cable at chhakoh from exist 63 kva 11/0.4 kv s/stn chhakoh -ist in (e) section chhakoh under esd namhol.
Tender for con 1 phase to 3 phase and prov new st 8 mtr pole to raising of ab cable at chhakoh from exist 63 kva 11/0.4 kv s/stn chhakoh -ist in (e) section chhakoh under esd namhol.
Read moreMaintenance of 3.3kv 3 phase overhead line due to damage of pipe pole from bhowra power house to pumping site 4a patch for smooth pumping operation at 4a patch under bhowra(s) colliery.
Maintenance of 3.3kv 3 phase overhead line due to damage of pipe pole from bhowra power house to pumping site 4a patch for smooth pumping operation at 4a patch under bhowra(s) colliery.
Read moreShifting of 3.3 kv overhead lines from its existing position to new position at 4a-patch of bhowra south colliery
Shifting of 3.3 kv overhead lines from its existing position to new position at 4a-patch of bhowra south colliery
Read moreErection of 3.3 kv overhead line
Erection of 3.3 kv overhead line
 for providing power supply to
 pump in west patch of quar ry f or
 dewatering of coal f ace at sayal- d
 project
Read moreof your Industry type